Laserfiche WebLink
CIRCES Cost Estimatinst Software <br />• <br />PROJECT IDENTIFICATION <br />Task # : 025 <br />Date : 01/05/2006 <br />User: JRS <br />State :Colorado <br />County : Routt <br />Site : Yoast Mine <br />Permitfob# : C-1994082 <br />Abbreviation :none <br />Filename : C082-025 <br />Agency or organization name : Colorado Division Of Minerals And Geology <br />Permit or other job action : Permit Renewa102 <br />Task description : Grade Facilities Area Surface Maferia! into Fill <br /><: <br />HOURLY EQUIPMENT COST <br /> Basic machine :Cat D11R - 11 U Horsepower : 850 <br /> Blade type :Universal <br /> Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br /> Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cost/hour : $111.01 NA <br /> Operating cosUhour : $188.40 100 <br /> Ripper op. cosUhour : $0.00 0 <br /> Operator cost/hour : $31.78 NA <br /> Total unit cosUhour : $331.19 Total fleet cosUhour : $662.39 <br />• <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 8,067 LCY factor : NA volume : 8,067 LCY <br /> <br />Source of estimated volume :Operator Estimate <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 100 feet Material consistency : 0.80 (Cat HB) <br />Unadjusted hourly production : 2,870.3 LCY/hr Dozing method ; 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1 shitUday) <br />Dry, non-cohesive Spoil pile : 0.80 (fnd-rfJ <br /> Push gradient : 1.00 (Cat HB) <br />Average push gradient : 0.00 % (pos) Altitude : 0.93 (Cat HB) <br />Average site alfitude : 7,800 feet Material weight : 0.71 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material wninht • ?.250 lhs/LCY Net correction : 0.26 <br />