My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-02-28_PERMIT FILE - C1994082A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1994082A
>
2006-02-28_PERMIT FILE - C1994082A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:16:19 PM
Creation date
6/27/2013 9:31:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082A
IBM Index Class Name
Permit File
Doc Date
2/28/2006
Doc Name
Bond Cost Worksheets
Section_Exhibit Name
Tab 25 Attachment 25-1
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimatinst Software <br />• <br />PROJECT IDENTIFICATIC <br />Task # : 024 <br />Date : 01/05/2006 <br />User : JRS <br />State :Colorado PermiUob# : C-1994082 <br />County :Routt Abbreviation :none <br />Site :toast Mine Filename : C082-024 <br />Agency or organization name :Colorado Division Of Minerals And Geology <br />Permit or other job action :Permit Renewa102 <br />task description :grade Haul Road Surface Material into Fill <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D 11 R - 11 U <br />Blade type :Universal <br />Attachment no. 1 : ROPS Cab <br />Attachmentno. 2 :3shank ripper' <br />Cost Breakdown <br />• <br />Ownership cosUhour <br />Operating cost/hour <br />Ripper op. cost/hour <br />Operator cosUhour <br />Total unit cosUhour <br />MATERIAL QUANTITIES <br />Initial <br />volume : 46,111 LCY <br />Source of estimated volume :Op <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION <br />Average push distance : 100 feet <br />Unadjusted hourly production : 2,870.3 LCY/hr <br />Material consistency description <br />Drv. non-cohesive <br />0.00 % (/ <br />7,800 feet <br />3,250 IbsfLCY <br />Swell <br />factor <br />Utilization <br />$>11.01 NA <br />$188.40 100 <br />$0.00 0 <br />$31.78 NA <br />Horsepower: 850 <br />Shift basis : 1 perday <br />Data source : (CRG) <br /> <br /> <br /> <br /> <br />$331.19 Total fleet cosUhour <br />Loose <br />NA volume: <br />46,111 <br />LCY <br />ondition Correction Factors Source <br />Operator skill : 0.75 (avg.) <br />Material consistency : 0.80 (Cat Nt3) <br />Dozing method : 1.00 (gen.) <br />Visibility : 1.00 (avg.) <br />Job efficiency : 0.83 (1shiR/day) <br />Spoil pile : 0.80 (fnd-rf) <br />Push gradient : 1.00 (Cat HB) <br />Altitude : 0.93 (Cat HB) <br />Material weight : 0.71 (Cat HB) <br />Blade type : 1.00 (S/SU/U) <br />Net correction : 0.26 <br />Estimate <br />Average push gradient <br />Average site altitude <br />Material weight <br />Weight description <br />Gmvel - Pihun <br />• JOB TIME AND COST <br />Fleet size : 2 Dozers) <br />Unit cost : $0.440 /LCY <br />Adjusted unit production : 752.34 LCY/hr <br />Adjusted fleet pmduction : 1,504.69 LCY/hr <br />Total job time : 30.64 Hours <br />Total job cost : $20,299 <br />
The URL can be used to link to this page
Your browser does not support the video tag.