Laserfiche WebLink
Stockpile <br />1999 Vol <br />2001 Vol' <br />2002 Vol` <br />DMG Vol d <br />DMG Vole Pile Max Vol <br />Designation <br />(ac -ft ) <br />(ac -ft) <br />(ac -ft ) <br />(ac -ft <br />(ac -ft ) <br />(ac -ft <br />A <br />23.3 <br />23.3 <br />23.3 <br />23.3 <br />23.3 <br />23.3 <br />B <br />13.0 <br />13.0 <br />13.0 <br />13.0 <br />13.0 <br />13.0 <br />C <br />13.7 <br />13.7 <br />13.7 <br />13.7 <br />13.7 <br />13.7 <br />D <br />27.9 <br />27.9 <br />17.9 <br />0.0 <br />17.9 <br />27.9 <br />E <br />129.7 <br />129.7 <br />35.7 <br />0.0 <br />35.7 <br />129.7 <br />F <br />68.1 <br />68.1 <br />49.1 <br />0.0 <br />49.1 <br />68.1 <br />G <br />33.8 <br />33.8 <br />0.0 <br />0.0 <br />33.8 <br />33.8 <br />H <br />55.4 <br />55.4 <br />55.4 <br />53.0 <br />55.4 <br />55.4 <br />I <br />41.4 <br />41.4 <br />41.4 <br />25.0 <br />41.4 <br />41.4 <br />K <br />120.6 <br />120.6 <br />120.6 <br />59.9 <br />120.6 <br />120.6 <br />L <br />32.3 <br />68.4 <br />68.4 <br />65.0 <br />68.4 <br />68.4 <br />M <br />0.0 <br />45.4 <br />65.3 <br />105.0 <br />65.3 <br />65.3 <br />O <br />0.0 <br />86.6 <br />100.2 <br />105.0 <br />100.2 <br />100.2 <br />P <br />0.0 <br />3.9 <br />6.3 <br />105.0 <br />6.3 <br />6.3 <br />Q <br />0.0 <br />0.0 <br />108.0 <br />105.0 <br />108.0 <br />108.0 <br />R <br />0.0 <br />66.9 <br />74.7 <br />105.0 <br />74.7 <br />74.7 <br />Total <br />559.2 <br />798.1 <br />793.0 <br />777.9 <br />826.8 <br />949.8 <br />1999 Stockpile Volumes from 1999 Annual Reclamation Report <br />2001 Stockpile Volumes from 2001 Annual Reclamation Report <br />2002 Stockpile Volumes from 2004 Annual Reclamation Report <br />d: Volumes from 2005 DMG RN -02 Estimate, in LCY - from Page 25 -1 -11 <br />DMG Volume Used in 6 December 2005 <br />Recalculation <br />: Maximum Pile Volume Based on 1999, 2001 and 2002 Annual Reclamation Reports <br />Borehole Sealing and Facilities Demolition <br />There are 2 -inch wells (16) and 4 -inch wells (43) to be sealed. The associated costs <br />include: <br />- installing a bottom plug <br />- filling holes with cement <br />- cut casing at surface <br />- install Borehole marker <br />- drill rig time <br />- water truck time <br />The facilities removal includes costs for: <br />- barbed wire fence removal <br />- power line removal <br />- culvert removal <br />- diesel/gas tank removal and disposal <br />TR -53 5 Revised 05/13 <br />