My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-06-25_HYDROLOGY - M1974092
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1974092
>
2013-06-25_HYDROLOGY - M1974092
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:21:43 PM
Creation date
6/25/2013 3:51:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1974092
IBM Index Class Name
HYDROLOGY
Doc Date
6/25/2013
Doc Name
AUGMENTATION PLAN
From
WATER DIVISION NO. 1
To
DRMS
Email Name
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
19.5 Batch Plant Commercial Well. The Batch Plant Commercial Well, Well Permit <br />2104 -F, provides water for commercial operations at the Batch Plant. For purposes of this plan <br />for augmentation, it will assumed that 100% of the water withdrawn from the well is consumed. <br />19.6 Batch Plant Irrigation Well. The Batch Plant Irrigation Well can be used to <br />provide irrigation water using a sprinkler system for up to thirty acres of land in the vicinity of <br />the Batch Plant. 80% of the water withdrawn from the well for irrigation purposes will be <br />deemed to be consumed, with 20% returning to the stream system as return flows. The Batch <br />Plant Irrigation Well will be pumped only if and to the extent that Applicant has more <br />augmentation water available than needed to fully augment depletions from the Barlow Pit and <br />Batch Plant Commercial Well. <br />19.7 Lagging of Depletions from Wells. The effect of withdrawals from the Batch <br />Plant Commercial Well and Irrigation Well have a delayed depletive effect on the South Platte <br />River. The table included in the accounting form attached hereto as Exhibit D sets forth the <br />delayed depletive effect owed to the South Platte River in each month as a percentage of the <br />annual withdrawals (excluding 20% of the irrigation withdrawal). Applicant will augment all out <br />of priority depletions from the such wells during the month that such depletions effect the South <br />Platte River as shown on such table, subject to the provisions of Section 23 below. <br />20. Annual Proiections. On or before May 31" of each year, Applicant will make a <br />projection of the operation of this plan for augmentation for the succeeding period of June I" to <br />May 315`, which shall be the annual operational period for this plan. The purpose of the <br />projection is to demonstrate that Applicant will have sufficient augmentation supplies to replace <br />all depletions and return flow obligations during the upcoming annual accounting period. The <br />projection will be provided to the Division Engineer. The Objectors will receive the projection <br />and all backup information to support the projection upon written request and payment of <br />reasonable copying and delivery costs. <br />20.1. Information Required. The annual projection shall include the following <br />information: <br />(a) The surface area of water exposed in the Barlow Pit, less the Exempt 2.7 <br />Acres, and the resulting monthly net evaporative losses projected, based <br />on the table set forth in Section 19.1 above. <br />(b) The amount actually pumped from the Batch Plant Commercial Well and <br />Irrigation Well during the previous annual accounting period, together <br />with the amount and timing of delayed depletions to occur during the <br />current projection period based on past pumping of the Batch Plant <br />Commercial Well and Irrigation Well. <br />(c) Projected pumping from the Batch Plant Commercial Well and Irrigation <br />Well to occur in the upcoming accounting year, with a schedule of <br />projected monthly depletions resulting from such pumping. <br />11 of 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.