Laserfiche WebLink
the appropriate steps for inspections and spill response in case of a spill. Portable plants and <br />equipment are covered under their own portable plant SPCC Plans. If any fuel spill is <br />encountered, the material will be removed from the site. The Division will be notified in the case <br />of any spill. Upon final reclamation, all equipment will be removed from the site. <br />The asphalt plant will consist of burner fuel tanks, asphalt cement tanks, mixer drum, storage <br />silos, loading hopper and a control room. Asphalt batching operation will only be conducted in <br />the warmer months as it can only be installed in these months. Excess asphalt produced during <br />batching operations as well as spillage will be cleaned up daily and placed in an asphalt material <br />storage location. The asphalt material will be directly recycled into the mixer drum during <br />further asphalt production runs. <br />Control rooms for the plants, truck scale, and office trailer will be the only other structures on <br />site. Portable toilets and potable water will be brought on site for employee use, and serviced by <br />a contractor. <br />Maintenance vehicles will visit the site regularly to provide oil, grease, and perform other minor <br />maintenance on vehicles and equipment. Any major equipment repair work will be performed off <br />site. <br />The following list is the best estimate of the required equipment to be used onsite throughout the <br />mine life: <br />3.1 Gravel Crushing Equipment <br />• Portable Jaw Crusher <br />• Portable Cone Crusher <br />• Portable Screen Decks <br />• Portable Stacking / Transporting Conveyors <br />• Water Truck for dust suppression <br />• Portable Generators for plants <br />• Electric Control Van <br />• Backhoes <br />• Wheel Loader Cat 988, Cat 980 <br />Hayden Gravel Pit, May 2013 D -4 <br />