Laserfiche WebLink
June 4,2013 C-1982-057/Seneca 11-W Mine JLE <br /> along this road. The Division checked the culverts long this road and they were clear and functional. <br /> For Road K,the Division measured the width and grade of this road at a point about 381 feet east of grade stake <br /> 5+00. The width of the road was 15 feet wide and the grade was about 12%. The Division interpolated the grade <br /> at this point based on Exhibit No. 20-3 and found it to be about 10%. This slight difference in grade is allowable. <br /> The surface of the road was recently graded and maintained. The road appears to be draining properly and large <br /> rills and gullies were not observed along this road. The road was approved to be 20 feet wide. <br /> The grade and width of Road J was verified during the May 14, 2013 inspection. Please see that report for details. <br /> During this inspection it was noted that the surface of the road was recently graded and maintained. The road <br /> appears to be draining properly and large rills and gullies were not observed along this road. <br /> For the Mine Entrance Road/County Road 53,the Division checked the grade at four points along the road. The <br /> approved post mine road width is 28 feet. The first point was at culvert F-3 the road was measured to be 30 feet <br /> in width and at 5%grade. The Division interpolated the grade of this road based on Exhibit 20-3 and found it to <br /> be 5%. The next point was at culvert ME-2,the road was measured to be 28 feet and at a 1.5%grade. The <br /> Division interpolated the grade at this point based on the Exhibit 20-3 and found it to be about 3.3%. The next <br /> point was at about the 30+00 grade stake based on the Exhibit 20-2 map. The width of the road at this point was <br /> measured to be 28 feet and the grade was found to be about 4%. The Division interpolated the grade of this road <br /> based on Exhibit 20 3 and found it to be 5%. The next point was at culvert ME-1,the width of the road was 28 <br /> feet and the grade was measured to be 1%. The Division interpolated the grade of the road at this point based on <br /> Exhibit 20-3 and found it to be 0%. Minor rills were observed at several location along the road embankment, <br /> however large rills and gullies were not observed. It appears that SCC is attempting to stabilize the areas with <br /> vegetation and straw waddles. Overall the road is well maintained and appears to drain properly. <br /> SUPPORT FACILITIES -Rule 4.04: <br /> The area around the shop is graded and maintained and equipment is stored throughout this area. <br /> Enclosures: <br /> 1.)Attachment A; Transect 1, 2, and 4 Post Mine Topography Check, Table and Chart. <br /> 2.)Seneca II-WMine;.Tune 2013Inspection Map. <br /> Number of Partial Inspection this Fiscal Year: 12 <br /> Number of Complete Inspections this Fiscal Year: 4 <br /> Page 8 of 12 <br />