Laserfiche WebLink
Applicable bond held after 60% release under SL -1 <br />1 Cost remains for 18 -Right Fencing <br />Fish Creek Tipple Installation (including the Middle Creek Soil Stockpile) <br />Task 190 <br />Demolition' <br />Task 011 <br />Regrading <br />Task 047 <br />Hauling <br />Topsoil <br />Task 148 <br />Replacement <br />Task 185 Revegetation <br />Subtotal of Direct Costs <br />Overhead and Profit <br />Contract Amount (Direct + Overhead and Profit) <br />Legal, Engineering, and Management <br />Total applicable performance bond required <br />Bond Release No. 1 Phase 1 Release amount (60% of <br />applicable bond) <br />Required Bond to complete reclamation <br />Applicable Bond held after 60% release under SL -1 <br />1 Cost remains for FCT Substation, Substation Pad, <br />Substation Transformer, Power line, Railway Siding <br />Track, Railway Ballast, Fencing, and culverts #4, #6, #8 <br />Please review the proposed bond amounts listed above based on the SL -1 application. <br />Page 3 of 3 <br />$13,978.01 <br />$171,313.29 <br />$37,493.17 <br />$100,578.11 <br />$44,860.76 <br />$6,109.56 <br />$360,354.89 <br />$61,633.91 <br />$421,988.80 <br />$39,033.96 <br />$461,022.76 <br />$276,613.65 <br />$143,309.62 <br />$184,409.11 <br />If Twentymile Coal, LLC has any questions or concerns, please respond to this adequacy letter <br />on or before July 1, 2013. If no response is received the Division will propose a decision to <br />approve the SL -1 application with the above mentioned items noted. <br />Sincerely, <br />Jason Musick <br />Environmental Protection Specialist <br />('-PR-O' <br />