Laserfiche WebLink
Page 2 of 3 <br />that the facilities associated with the "Brown Palace should be released as a part of <br />the SL -01 application, please provide to the Division TC's justification. <br />2. The Division's conducted an estimate of performance bonds associated with the EMD <br />Vent Fan Site, the 18 -Right Shaft Site, and the <br />Fish Creels Tipple site and associated soil <br />footprint. The costs associated with the estimate are based on tasks determined <br />in the <br />Division's Permit Renewal No. 6 review. All <br />costs were last updated during <br />the fourth <br />quarter of 2012 and represent the most recent update to reclamation costs. <br />Please see the <br />table below: <br />EMD /9 -Right Ventilation Shaft Installation <br />Task 180 <br />Shaft Sealing <br />$3,075.11 <br />Task 190 <br />Demolition' <br />$26,215.90 <br />Task 015 <br />Regrading <br />$13,231.23 <br />Task 185 <br />Revegetation <br />$1,758.14 <br />Topsoil <br />Task 151 <br />Replacement <br />$14,869.89 <br />Subtotal of Direct Costs <br />$59,150.27 <br />Overhead and Profit <br />$17,602.60 <br />Contract Amount (Direct + Overhead and Profit) <br />$76,752.87 <br />Legal, Engineering, and Management <br />$7,099.63 <br />Total applicable performance bond required <br />$83,852.50 <br />Bond Release No. 1 Phase 1 release amount (60% of <br />applicable amount) <br />$50,311.50 <br />Required bond to complete reclamation <br />$29,603.35 <br />Applicable performance bond held after 60% release <br />under SL -1 <br />$33,541.00 <br />' Cost remains for EMD Fencing <br />18 -Right Intake Shaft Installation <br />Task 180 <br />Shaft Sealing <br />$2,204.58 <br />Task 190 <br />Demolition' <br />$10,141.57 <br />Task 181 <br />Borehole Sealing <br />$10,192.00 <br />Task 017 <br />Regrading <br />$729.82 <br />Topsoil <br />Task 166 <br />Replacement <br />$2,087.00 <br />Task 185 <br />Revegetation <br />$1,130.23 <br />Subtotal of Direct Costs <br />$26,485.20 <br />Overhead and Profit <br />$5,501.09 <br />Contract Amount (Direct + Overhead and Profit) <br />$31,986.29 <br />Legal, Engineering, and Management <br />$2,958.72 <br />Total applicable performance bond required <br />$34,945.01 <br />Bond Release No.1 Phase I release amount (60% of <br />applicable bond) <br />$20,967.00 <br />Required Bond to complete reclamation <br />$7,296.83 <br />