My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-06-07_REVISION - M2004031
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2004031
>
2013-06-07_REVISION - M2004031
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:21:18 PM
Creation date
6/11/2013 3:45:26 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2004031
IBM Index Class Name
REVISION
Doc Date
6/7/2013
Doc Name
TR-02 INQUIRY
From
CONSULTANT
To
DRMS
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />Ali ro a C. <br />LARRY E. O'BRIAN 7985 VANCE DRIVE, SUITE 205A <br />FOUNDER ARVADA, COLORADO 80003 <br />STEVAN L. O'BRIAN <br />PRESIDENT RECEIVED FAX 303 - 423 -7599 <br />June 4, 2013 <br />JUN 0 7 2013 <br />Mr. Berhan Keffelew DMSION OF RECLAMATION <br />MINING AND .1FETY <br />Reclamation Specialist <br />Division of Reclamation, Mining and Safety <br />1313 Sherman St., Suite 215 <br />Denver, CO 80203 <br />Dear Berhan, <br />RE: Aggregate Industries, Inc. - Henderson Pit <br />Technical Revision 02 - Permit # M- 2004 -031 <br />Fred Orr the owner of the land being flooded east of the mine has asked me to file the following <br />information regarding the Aggregate Industries filing called Technical Revision 02. We have no <br />problem with the TR but feel it is appropriate to ask the Division to place some date for when the <br />structure they propose installing be will be completed. In May 2013 at a meeting with the <br />applicant, their engineers, myself and Lisa DelVescovo, Mr. Orr's representative and the Division, <br />we were assured the proposed fix they submitted in TR #1 would be installed as soon as the <br />Division approved the TR. The following timetable outline what they considered soon <br />• May 15, 2012 - Site meeting <br />• August 7. 2012 - Amended TR 01 filed based on meeting ( -84 days) <br />• February 14, 2013 - Al meets with Division and says the plan approved in TR #1 is too <br />expensive and promised to file a revised plan. (-132 more days) <br />• April 30, 2013 - Al files TR 02 to address promise in February 2013 (-75 more days) <br />• May 21, 2013 - Al files response to TR 02 adequacy ( -29 more days) total time —366 <br />(lass. <br />I guess their idea of shortly doesn't match mine and still no commitment date for when they will <br />install the temporary measures to relieve the impacts to Mr. Orr's land (that in my opinion won't <br />work). If you go back to the inspection, David Bird did on October 5, 2011 and his correction <br />date of January 4, 2012 that's nearly 503 days ago. Seems to me this is more then adequate time <br />to have addressed a permanent fix for the problem not just proposing a temporary fix. <br />Suffice it to say that I am skeptical that TR 02 will work as they say, even if it ever gets installed. <br />RECEIVED <br />JUN 0 7 ?013 <br />DIVISION OF RECLAMATION <br />MINING AND SAFETY <br />
The URL can be used to link to this page
Your browser does not support the video tag.