Laserfiche WebLink
Loader Worksheet Cont'd <br />Task # 006 <br />Total Travel Time: <br />Total Cycle Time: <br />Load Bucket Capacity <br />Rated Capacity: 3.90 LCY (heaped) <br />Bucket Fill Factor: 1.100 Other - rock/dirt mixtures (100 - <br />Adjusted Capacity: 4.29 LCY <br />Job Condition Correction Factors <br />Site Altitude: 9700 feet <br />Source <br />Altitude Adj: 1.00 (CAT HB) <br />Job Efficiency: 0.83 (1 shift/day) <br />Net Correction: 0.83 multiplier <br />Unadjusted Hourly Unit Production: 375.91 <br />Adjusted Hourly Unit Production: 312.01 <br />Adjusted Hourly Fleet Production: 312.01 <br />JOB TIME AND COST <br />Page 2 of 2 <br />0.1522 minutes <br />0.6847 minutes <br />/0)1.100 <br />LCY/Hour <br />LCY/Hour <br />LCY/Hour <br />Fleet size: 1 Loader(s) Total job time: 0.96 Hours <br />Unit cost: $0.305 /LCY Total job cost: $91.00 <br />CIRCES Cost Estimating Software <br />