My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-06-07_REVISION - M1977215
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977215
>
2013-06-07_REVISION - M1977215
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:21:18 PM
Creation date
6/11/2013 3:15:25 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977215
IBM Index Class Name
REVISION
Doc Date
6/7/2013
Doc Name
TR-22 APPROVAL
From
DRMS
To
OPERATOR
Type & Sequence
TR22
Email Name
RCO
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pagel of 2 <br />WHEEL LOADER - LOAD AND CARRY WORK <br />Task description: Carry fill and topsoil to 9700 cutbank <br />Site: Bulldog Mine Operation Permit Action: TR -22 Permit/Job #: M1977215 <br />PROJECT IDENTIFICATION <br />Task #: 006 State: <br />Date: 6/7/2013 County: <br />User: RCO <br />Colorado <br />Mineral <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: CAT 938H high lift <br />Attachment l: ROPS Cab <br />Cost Breakdown: <br />Utilization % <br />Ownership Cost/Hour: $21.45 NA <br />Operating Cost/Hour: $37.75 100 <br />Operator Cost/Hour: $35.82 NA <br />Total Unit Cost/Hour: $95.01 <br />Total Fleet Cost/Hour: $95.01 <br />MATERIAL QUANTITIES <br />Initial volume: 300 <br />Loose volume: 300 <br />Abbreviation: None <br />Filename: M215 -006 <br />Horsepower: 172 <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />CCY Swell factor: 1.000 <br />LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Loader Cycle Time: Unadjusted Basic Cycle Time (load, dump, maneuver): <br />0.483 <br />minutes <br />Cycle Time Factors <br />Length <br />Factor min.) <br />Source <br />Material: <br />No adjustment - factor not applicable 0.00 <br />0.000 <br />(Cat HB) <br />Stockpile: <br />Conveyor or dozer piled 10 ft. high or less 0.01 <br />0.010 <br />(Cat HB) <br />Truck Ownership: <br />No adjustment - factor not applicable 0.00 <br />0.000 <br />(Cat FIB) <br />Operation: <br />Inconsistent operation 0.04 <br />1 0.040 <br />(Cat HB) <br />Dump Target: <br />Nominal tar et 0.00 <br />1 0.000 <br />Cat HB <br />Net Cycle Tune Adjustment: <br />Adjusted Basic Cycle Time: <br />0.050 <br />0.533 <br />Rolling Resistance — Road Conditions <br />Haul: Firm, smooth, rolling, dirt/It. surfaced, watered, maintained 3.0 <br />Return: Firm, smooth, rolling, dirt/It. surfaced, watered, maintained 3.0 <br />Haul and Return Time <br />minutes <br />minutes <br />CIRCES Cost Estimating Software <br />Length <br />Grade Res. <br />Rolling <br />Total Res. <br />Travel Time <br />(feet) <br />(%) <br />Res. ( %) <br />(%) <br />(minutes) <br />Source <br />Haul Route: <br />100 <br />0.00 <br />3.00 <br />3.00 <br />0.0785 <br />(Cat HB) <br />Return Route: <br />100 <br />0.00 <br />3.00 <br />3.00 <br />0.0737 <br />(Cat HB) <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.