Laserfiche WebLink
Addendum to the Collom Area Geology Pre - Feasibility Report <br />2.0 Geological Exploration <br />2.1 2005/2006 Exploration Drilling <br />Colowyo was still drilling and sampling the Collom Mine Area when the <br />August 2005 report was written. Since then, Colowyo drilled approximately <br />68 holes within the Collom Mine Area, see Figure 2.1. Colowyo also collected <br />approximately 3,139 incremental coal quality samples and approximately 597 <br />composite coal quality samples during that time. Table 2.1 summarizes hole <br />locations and hole type. <br />Table 2.1 <br />Summary of 2005 and 2005 Collom Area Drill Hole Locations <br />Drill Hole Eastin Northin Collar I Total Depth Hole Tye Model Flag FQuality Fla <br />C -05 -01 <br />1,320,490.38 353,059.92 <br />7,091.68 <br />920.90 <br />Core - Spot Core <br />TRUE <br />TRUE <br />C -05 -02 <br />1,320 610.31 351 337.67 <br />7,287.59 <br />11003.90 <br />Core -Spot Core _ <br />- -- <br />TRUE <br />TRUE <br />C -05 -03 <br />1,319,081.68 348,582.56 <br />7,404.41 <br />1,000.00 <br />Core -_Spot Core_ <br />TRUE <br />TRUE <br />C-05-04 <br />1,324,503.37 353,763.98 <br />7,300.97 <br />960.00 <br />Core ,,7 Spot Core <br />TRUE <br />TRUE <br />C_05 -05 <br />1,323,912.03 351,069.28 <br />7,411.76 <br />920.00 <br />Core - Spot Core <br />TRUE <br />TRUE <br />C- 05 -06_ <br />1,322,329.87 348,338.00 <br />7,562.78 <br />860_00_ <br />Core - Spot Core <br />____TRUE <br />C-05_07 <br />! 1,321,490.84 346,130.02 <br />7,568.30 <br />840.00 <br />Rotary - Mineable Thickness <br />TRUE <br />FALSE <br />C -05 -09 <br />-_ <br />1 323 331.41 344 546.63 <br />7 801.44 <br />843.50 <br />Core - Spot Core <br />TRUE <br />TRUE <br />- <br />-10 <br />- --- -_ --1- <br />i 353,686.57 <br />{ <br />7,249.37 ! <br />_ <br />903.00 <br />Core - Spot Core <br />_- <br />TRUE <br />_TRUE <br />_C_05 <br />C= 05- 111,326,206.46 <br />_1_,1327,371.92 <br />351,596_26 <br />7,385_99 <br />_930.00 <br />Core - Spot Core_ <br />TRUE <br />_TRUE <br />C -05 -12 <br />1,326 402_45 348,246_97_ <br />7,699_83 <br />903.00 <br />Core - Spot Core <br />TRUE <br />TRUE <br />C-05-13 <br />1,329,699.35 351,493.54 <br />7,363,64 <br />982.00 <br />Core - Spot Core <br />TRUE <br />TRUE <br />C-05-L4 <br />^_.1,328,561.78 349,599.37 <br />7,571.51 ; - <br />1,083.00 <br />Core - Spot Core_ <br />TRUE <br />TRUE <br />C-05-15 <br />1,327,241.80 346,647.12 <br />7,865.7.6_ !902.00 <br />Core - Spot Core _ <br />TRUE <br />- -TRUE <br />C -05 -16 <br />__x_11326404.37 3451301.85 <br />7,931.69 <br />800_00 <br />Core_- Spot Core <br />TRUE <br />TRUE .. <br />C-05-17 <br />1�328L659.39 345,815.65 <br />7,791.82 <br />960.00 <br />_Core - Spot -Core <br />TRUE <br />TRUE <br />C- 05- 181331,483.52 <br />_ <br />347,915.01 <br />7,651.26 <br />__. <br />1,025 00 <br />Core - Spot Core <br />TRUE <br />- -. <br />-TRUE <br />C -05 -19 <br />_ 1,332,311.36 347,270.60 <br />7,647.61 <br />1,002.80 <br />- _ <br />Core - Spot Core <br />TRUE <br />TRUE <br />- - <br />C -05 20 <br />11330,429.95 345,271 96 <br />7,769.09 <br />_ 860.00 <br />Core Spot Core <br />TRUE <br />TRUE <br />C -05 21-_x_1,326,040.93 <br />342,976.58 <br />8,031.53 <br />661.00 <br />Core Spot_Core <br />TRUE <br />_FALSE__ <br />C -05 -22 <br />71,325,869.37 341,443.83 <br />8,163.66 <br />789.30 <br />Core - Spot Core <br />TRUE <br />TRUE <br />C-05-23 <br />i 13272-5 .39 340 829`02 <br />81282.07 <br />860_00 <br />Core Spot_Core <br />TRUE <br />TRUE __ - <br />C -05 24__x_1,330,813.93 <br />`_3421955.12 <br />7,819.41 <br />723. -00� <br />CoreS_p Core <br />_ TRUE <br />TRUE _ <br />C -05 -25 <br />1,329,773.97 ^342,324.13 <br />7,829.11 <br />640 .000_ <br />Core - Spot Core <br />TRUE _ <br />TRUE <br />C -05 -26 <br />1,329,186.89 340,651.01 <br />8,078.62 <br />658.00 <br />Continuous Core <br />TRUE <br />TRUE <br />C -05 -27 i 1,3� 30,947.00 3411302.65 8,057.94 <br />800.0.0 <br />_Geotechnical <br />Core _Spot Core <br />TRUE <br />TRUE <br />C -05 -28 <br />1,332,889.06 ? 345,749_96 <br />7,524.31 <br />920.00 <br />Core -Spot Core <br />-_ TRUE <br />_ TRUE <br />C-05-29 <br />_ _ <br />344,670 77 71703.91 1,100.00 +_ <br />_ <br />Core - Spot Core_ <br />TRUE <br />TRUE_ <br />C -05 -30 <br />1,333,242.09 i 342,872 89 <br />7,866.65 <br />920.00 <br />Core - Spot Core <br />TRUE <br />TRUE <br />C -05 -31 <br />I 1,334,608.29 342,869.51 <br />7,741.84 1 <br />_ 880_00 - <br />Core - Spot Core <br />_TRUE <br />TRUE <br />C -05 -32 <br />f 1,333,720.16 341,196.73 <br />!.7,937.12 <br />818.00 ! <br />Geotechnical Continuous Core_ <br />TRUE <br />TRUE_ <br />C -05 -33 <br />! 1 326 950.16 339,692.98 <br />-- f- -�� - -- -- <br />8,352.74 ! <br />- -r- <br />840.80 <br />- - - - --I -- <br />Corey Smoot Core - <br />TRUE <br />- <br />TRUE <br />y C-05-34 <br />1,328,764.15 339,627.91 <br />1 8,265.48 -_ <br />-- 741.30! <br />Come - 5 t Corp <br />TRUE <br />TRUE <br />September 2006 Page 2 of 25 <br />