My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-05-07_REVISION - M2007014 (4)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2007014
>
2013-05-07_REVISION - M2007014 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:38:22 PM
Creation date
5/29/2013 3:47:05 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007014
IBM Index Class Name
REVISION
Doc Date
5/7/2013
Doc Name
SR-01 COST SUMMARY
From
DRMS
To
OPERATOR
Type & Sequence
SR1
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br />COLORADO <br />D IV IS I ON Of <br />RECLAMATION <br />MINING <br />SAFETY <br />EQUIPMENT MOBILIZATION /DEMOBILIZATION <br />Task description: Mobilize/Demobilize Equipment <br />Site: Byzantine Quarry Permit Action: SRO1 <br />PROJECT IDENTIFICATION <br />Task #: 105 State: Colorado <br />Date: 5/7/2013 County: Fremont <br />User: TC 1 <br />Agency or organization name: DRMS <br />EQUIPMENT TRANSPORT RIG COST <br />Page 1 of 2 <br />Permit/Job #: M2007014 <br />Abbreviation: None <br />Filename: M014 -105 <br />Shift basis: 1 per day <br />Cost Data Source: CRG Data <br />Truck Tractor Description: GENERIC ON- HIGHWAY TRUCK TRACTOR, 6X4, DIESEL POWERED, <br />400 HP (2ND HALF, 2006) <br />Truck Trailer Description: GENERIC FOLDING GOOSENECK, DROP DECK EQUIPMENT TRAILER <br />(25T, 50T, AND 100T) <br />Cost Breakdown: <br />Available Rig Capacities <br />0 -25 Tons <br />26 -50 Tons <br />51+ Tons <br />Ownership Cost/Hour: <br />$16.63 <br />$18.37 <br />$22.33 <br />Operating Cost/Hour: <br />$44.38 <br />$46.13 <br />$50.07 <br />Operator Cost/Hour: <br />$27.66 <br />$27.66 <br />$27.66 <br />Helper Cost/Hour: <br />$0.00 <br />$25.39 <br />$25.39 <br />Total Unit Cost/Hour: <br />$88.67 <br />$117.55 <br />$125.45 <br />NON ROADABLE EQUIPMENT: <br />Machine <br />Weight/ <br />Owner ship <br />Haul Rig <br />Fleet <br />Haul Trip <br />Return Trip <br />DOT Permit <br />Description <br />Unit <br />Cost/hr/ unit <br />Cost/hr /unit <br />Size <br />Cost/hr/ <br />Cost/hr/ fleet <br />Cost/ fleet <br />(TONS) <br />fleet <br />Cat D8T - 8U <br />53.70 <br />$63.00 <br />$125.45 <br />2 <br />$376.91 <br />$250.90 <br />$500.00 <br />Hydroseeder with <br />28.00 <br />$65.89 <br />$117.55 <br />1 <br />$183.44 <br />$117.55 <br />$250.00 <br />Tractor <br />Subtotals: 1 $560.35 1 $368.45 1 $750.00 <br />ROADABLE EOUIPMENT: <br />Machine Description <br />Total Cost/hr/ unit <br />Fleet Size <br />Haul Trip <br />Cost/hr/ fleet <br />Return Trip <br />Cost/hr/ fleet <br />Water Tanker, 2,500 Gal. <br />$29.58 <br />1 <br />$29.58 <br />$29.58 <br />Subtotals: 1 $29.58 1 $29.58 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.