Laserfiche WebLink
Mobilization Worksheet Cont'd Task # 105 Page 2 of 2 <br />EOUIPMENT HAUL DISTANCE and Time <br />Nearest Major City or Town within project area region: <br />CANON CITY <br />Total one -way travel distance: <br />3.00 miles <br />Average Travel Speed: <br />40.00 mph <br />Total Non - Roadable Mob/Demob Cost * <br />$2,760.02 <br />`* two round trips with haul rig: <br />NA <br />Total Roadable Mob/Demob Cost ** <br />$4.44 <br />* * one round trip, no haul rig: <br />Transportation Cycle Time: <br />Haul Time (Hours): <br />Return Time (Hours): <br />Loading Time (Hours): <br />Unloading Time (Hours): <br />Subtotals: <br />JOB TIME AND COST <br />Non - Roadable <br />Equipment <br />Roadable <br />Equipment <br />0.08 <br />0.08 <br />0.08 <br />0.08 <br />0.50 <br />NA <br />0.50 <br />NA <br />1.15 <br />0.15 <br />Total job time <br />2.30 Hours <br />Total job cost: $2,764.46 <br />CIRCES Cost Estimating Software <br />