My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-05-07_REVISION - M2007014 (4)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2007014
>
2013-05-07_REVISION - M2007014 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:38:22 PM
Creation date
5/29/2013 3:47:05 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007014
IBM Index Class Name
REVISION
Doc Date
5/7/2013
Doc Name
SR-01 COST SUMMARY
From
DRMS
To
OPERATOR
Type & Sequence
SR1
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COLORADO <br />CO ORA OF <br />RECLAMATION <br />MINING <br />SAFETY <br />Task description: <br />BULLDOZER WORK <br />Reapply Topsoil to Portions of Site to be Revegetated <br />Site: Byzantine Quarry Permit Action: SRO Permit/Job #: M2007014 <br />Page 1 of 2 <br />PROJECT IDENTIFICATION <br />Task #: 102 <br />Date: 5/7/2013 <br />User: TC 1 <br />State: Colorado <br />County: Fremont <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat D8T - 8U <br />Horsepower: <br />310 <br />Blade Type: <br />Universal <br />Attachment: <br />3 -shank ripper <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Abbreviation: None <br />Filename: M014 -102 <br />Total unit Cost/Hour: $211.01 <br />Total Fleet Cost/Hour: $422.03 <br />MATERIAL QUANTITIES <br />Initial Volume: <br />Utilization % <br />Ownership Cost/Hour: <br />$63.00 <br />Loose volume: <br />NA <br />Operating Cost/Hour: <br />$104.06 <br />100 <br />Ripper op. Cost/Hour: <br />$6.53 <br />100 <br />Operator Cost/Hour: <br />$37.41 <br />NA <br />Total unit Cost/Hour: $211.01 <br />Total Fleet Cost/Hour: $422.03 <br />MATERIAL QUANTITIES <br />Initial Volume: <br />13,500 <br />Swell factor: <br />1.125 <br />Loose volume: <br />15,188 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />Materials consistency description: <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />Weight description: <br />-10% <br />100 feet <br />931.6 LCY /hr <br />Consolidated stockpile 1.0 <br />6.100 feet <br />2.6501bs /LCY <br />Decomposed rock - 25% Rock, 75% Earth <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.