My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-05-07_REVISION - M2007014 (4)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2007014
>
2013-05-07_REVISION - M2007014 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:38:22 PM
Creation date
5/29/2013 3:47:05 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007014
IBM Index Class Name
REVISION
Doc Date
5/7/2013
Doc Name
SR-01 COST SUMMARY
From
DRMS
To
OPERATOR
Type & Sequence
SR1
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bulldozer Worksheet Cont'd Task # 101 Page 2 of 2 <br />Job Condition Correction Factor <br />Operator Skill: <br />Material consistency: <br />Dozing method: <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />Source <br />0.750 <br />(AVG.) <br />1.000 <br />(CAT HB) <br />1.000 <br />(GEN.) <br />1.000 <br />(AVG.) <br />0.830 <br />(1 SHIFT/DAY) <br />0.800 <br />(FND -RF) <br />1.225 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.793 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.4838 <br />Adjusted unit production: <br />Adjusted fleet production: <br />JOB TIME AND COST <br />249.54 LCY /hr <br />499.08 LCY /hr <br />Fleet size: 2 Dozer(s) <br />Unit cost: $0.846/LCY <br />Total job time: <br />Total job cost: <br />53.30 Hours <br />$22,493.28 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.