My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-05-10_REVISION - M2000030
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2000030
>
2013-05-10_REVISION - M2000030
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:27 AM
Creation date
5/29/2013 8:48:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000030
IBM Index Class Name
REVISION
Doc Date
5/10/2013
Doc Name
FW Increase
From
DRMS
To
Elam Construction, Inc.
Type & Sequence
SI1
Email Name
KAP
GRM
BJC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BULLDOZER WORK <br />Task description: Push Overburden Downslope, Create 3:1 <br />Site: AGRI -DLD Gravel Pit Permit Action: 2013 Inspection <br />PROJECT IDENTIFICATION <br />Task #: 002 <br />Date: 5/7/2013 <br />User: KAP <br />State: Colorado <br />County: La Plata <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D9T - 9SU <br />Horsepower: 405 <br />Blade Type: Semi - Universal <br />Attachment: 3 -shank ripper <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br />Pagel of 2 <br />Permit/Job #: M2000030 <br />Abbreviation: None <br />Filename: M030 -002 <br />Total unit Cost/Hour: $257.87 <br />Total Fleet Cost/Hour: $257.87 <br />MATERIAL QUANTITIES <br />Source <br />Initial Volume: <br />Utilization % <br />Ownership Cost/Hour: <br />$78.33 <br />Loose volume: <br />NA <br />Operating Cost/Hour: <br />$142.13 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$37.41 <br />NA <br />Total unit Cost/Hour: $257.87 <br />Total Fleet Cost/Hour: $257.87 <br />MATERIAL QUANTITIES <br />Source <br />Initial Volume: <br />30,400 <br />Swell factor: <br />1.215 <br />Loose volume: <br />36,936 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />50 feet <br />2,110.5 LCY/hr <br />Materials consistency description: Consolidated stockpile 1.0 <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />-20% <br />6,600 feet <br />3,300 lbs/LCY <br />Weight description: Decomposed rock - 75% Rock, 25% Earth <br />Job Condition Correction Factor <br />Source <br />Operator Skill: 0.750 <br />(AVG.) <br />Material consistency: 1.000 <br />CAT HB) <br />Dozing method: 1.000 <br />GEN. <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.