Laserfiche WebLink
Bulldozer Worksheet Cont'd Task # 001 Page 2 of 2 <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />1.000 <br />(AVG.) <br />0.830 <br />(1 SHIFT/DAY) <br />0.800 <br />(SSD -AC) <br />1.426 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.697 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.4455 <br />Adjusted unit production: <br />Adjusted fleet production: <br />JOB TIME AND COST <br />940.23 LCY/hr <br />940.23 LCY/hr <br />Fleet size: 1 Dozer(s) <br />Unit cost: $0.283/LCY <br />Total job time: <br />Total job cost: <br />43.80 Hours <br />$11,644.14 <br />CIRCES Cost Estimating Software <br />