My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-05-10_REVISION - M2000030
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2000030
>
2013-05-10_REVISION - M2000030
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:27 AM
Creation date
5/29/2013 8:48:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000030
IBM Index Class Name
REVISION
Doc Date
5/10/2013
Doc Name
FW Increase
From
DRMS
To
Elam Construction, Inc.
Type & Sequence
SI1
Email Name
KAP
GRM
BJC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 2 <br />BULLDOZER WORK <br />Task description: Spread Topsoil on Slopes <br />Permit Action: Spread Topsoil on Pit <br />Site: AGRI -DLD Gravel Pit Floor Permit/Job #: M2000030 <br />PROJECT IDENTIFICATION <br />Task #: 007 State: <br />Date: 5/7/2013 County: <br />User: KAP <br />Colorado <br />La Plata <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat D9T - 9SU <br />Horsepower: <br />405 <br />Blade Type: <br />Semi - Universal <br />Attachment: <br />3 -shank ripper <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Abbreviation: None <br />Filename: M030 -007 <br />Total unit Cost/Hour: $257.87 <br />Total Fleet Cost/Hour: $257.87 <br />MATERIAL QUANTITIES <br />Initial Volume: 19,200 <br />Swell factor: 1.000 <br />Loose volume: 19,200 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />100 feet <br />1,243.2 LCY/hr <br />Materials consistency description: Consolidated stockpile 1.0 <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />Weight description: <br />0% <br />6,600 feet <br />2,550 lbs/LCY <br />Earth - Dry packed <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />Material consistency: 1.000 (CAT HB) <br />CIRCES Cost Estimating Software <br />Utilization % <br />Ownership Cost /Hour: <br />$78.33 <br />NA <br />Operating Cost/Hour: <br />$142.13 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$37.41 <br />NA <br />Total unit Cost/Hour: $257.87 <br />Total Fleet Cost/Hour: $257.87 <br />MATERIAL QUANTITIES <br />Initial Volume: 19,200 <br />Swell factor: 1.000 <br />Loose volume: 19,200 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />100 feet <br />1,243.2 LCY/hr <br />Materials consistency description: Consolidated stockpile 1.0 <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />Weight description: <br />0% <br />6,600 feet <br />2,550 lbs/LCY <br />Earth - Dry packed <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />Material consistency: 1.000 (CAT HB) <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.