Laserfiche WebLink
Truck/Loader Worksheet Cont'd Task # 006 Page 3 of 3 <br />Haul Route: <br />Seg # <br />Haul Distance <br />(Ft) <br />Grade ( %) <br />Roll. Res <br />( %) <br />Total Res <br />( %) <br />Velocity <br />(fpm) <br />Travel <br />Time <br />min <br />1 <br />300.00 <br />0.00 <br />5.00 <br />5.00 <br />2218 <br />0.205 <br />2 <br />300.00 <br />10.00 <br />5.00 <br />15.00 <br />734 <br />-0.390 <br />3 <br />300.00 <br />0.00 <br />5.00 <br />5.00 <br />2218 <br />0.186 <br />Haul Time: 0.001 minutes <br />Return Route: <br />Seg # <br />Haul Distance <br />(Ft) <br />Grade ( %) <br />Roll. Res <br />( %) <br />Total Res <br />( %) <br />Velocity <br />(fpm) <br />Travel <br />Time <br />min <br />1 <br />300.00 <br />0.00 <br />5.00 <br />5.00 <br />2814 <br />0.135 <br />2 <br />300.00 <br />-10.00 <br />5.00 <br />-5.00 <br />2938 <br />0.147 <br />3 <br />300.00 <br />0.00 <br />5.00 <br />5.00 <br />2814 <br />0.107 <br />Loading Tool unit <br />Production 429.46 <br />Truck Unit Production <br />202.57 <br />Optimal No. of Trucks: 2 <br />Return Time: 0.389 <br />Total Truck Cycle Time: 2.253 <br />LCY/Hour Adjusted for job efficiency: <br />LCY/Hour Adjusted for job efficiency: <br />Truck(s) Selected Number of Trucks: <br />Adjusted hourly truck team production: 336.27 <br />Adjusted single truck/loader team production: 336.27 <br />Adjusted multiple truck/loader team production: 336.27 <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) <br />Unit cost: $0.635 /LCY <br />minutes <br />minutes <br />356.45 LCY/Hour <br />168.14 LCY/Hour <br />2 Truck(s) <br />LCY/Hour <br />LCY/Hour <br />LCY/Hour <br />Total job time: 58.88 Hours <br />Total job cost: $12,570.40 <br />CIRCES Cost Estimating Software <br />