Laserfiche WebLink
Page 1 of 2 <br />BULLDOZER WORK <br />Task description: Spread Topsoil on Upper Slopes <br />Site: Dillon Ranch Pit Permit Action: SO -01 Permit/Job #: M1987064 <br />PROJECT IDENTIFICATION <br />Task #: 007 State <br />Date: 5/20/2013 County <br />User: KAP <br />Colorado <br />La Plata <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D8T - 8SU <br />Horsepower: 310 <br />Blade Type: Semi - Universal <br />Attachment: 3 -shank ripper <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br />Abbreviation: None <br />Filename: M064 -007 <br />Total unit Cost/Hour: $210.98 <br />Total Fleet Cost/Hour: $210.98 <br />MATERIAL QUANTITIES <br />Initial Volume: 2,200 <br />Swell factor: 1.000 <br />Loose volume: 2,200 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />50 feet <br />1,400.0 LCY/hr <br />Materials consistency description: Loose stockpile 1.2 <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />Weight description: <br />10% <br />6,560 feet <br />2,550 lbs/LCY <br />Earth - Dry na( <br />Job Condition Correction Factor <br />Source <br />Operator Skill: 0.750 <br />Utilization % <br />Ownership Cost/Hour: <br />$63.00 <br />Dozing method: 1.000 <br />NA <br />Operating Cost/Hour: <br />$104.03 <br />100 <br />Ripper op. Cost/Hour: <br />$6.53 <br />100 <br />Operator Cost/Hour: <br />$37.41 <br />NA <br />Total unit Cost/Hour: $210.98 <br />Total Fleet Cost/Hour: $210.98 <br />MATERIAL QUANTITIES <br />Initial Volume: 2,200 <br />Swell factor: 1.000 <br />Loose volume: 2,200 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />50 feet <br />1,400.0 LCY/hr <br />Materials consistency description: Loose stockpile 1.2 <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />Weight description: <br />10% <br />6,560 feet <br />2,550 lbs/LCY <br />Earth - Dry na( <br />Job Condition Correction Factor <br />Source <br />Operator Skill: 0.750 <br />(AVG.) <br />Material consistency: 1.200 <br />CAT HB) <br />Dozing method: 1.000 <br />(GEN.) <br />CIRCES Cost Estimating Software <br />