Laserfiche WebLink
Truck/Loader Worksheet Cont'd Task # 006 Page 3 of 3 <br />Haul Route: <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />( %) <br />( %) <br />(fpm) <br />Time <br />min <br />1 <br />30.00 <br />0.00 <br />5.00 <br />5.00 <br />2218 <br />0.083 <br />Haul Time: 0.083 minutes <br />Return Route: <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />(%) <br />(%) <br />(fpm) <br />Time <br />min <br />1 <br />30.00 <br />0.00 <br />5.00 <br />5.00 <br />2814 <br />0.039 <br />Return Time: 0.039 <br />Total Truck Cycle Time: 1.522 <br />Loading Tool unit <br />Production 525.00 LCY/Hour Adjusted for job efficiency: _ <br />Truck Unit Production <br />206.96 LCY/Hour Adjusted for job efficiency: <br />Optimal No. of Trucks: 3 Truck(s) Selected Number of Trucks: <br />Adjusted hourly truck team production: 343.56 <br />Adjusted single truck/loader team production: 343.56 <br />Adjusted multiple truck/loader team production: 343.56 <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) <br />Unit cost: $0.729 /LCY <br />minutes <br />minutes <br />435.75 LCY/Hour <br />171.78 LCY/Hour <br />2 Truck(s) <br />LCY/Hour <br />LCY/Hour <br />LCY/Hour <br />Total job time: 6.40 Hours <br />Total job cost: $1,602.93 <br />CIRCES Cost Estimating Software <br />