Exhibit Page 36 <br />EXHIBIT L - RECLAMATION COSTS <br />Areas to be reclaimed with tasks needed <br />Location <br />Area <br />(acres) <br />Notes <br />Co <br />w <br />Q <br />CD <br />o <br />- <br />m <br />a <br />a <br />Work Area <br />3.8 <br />2 <br />NA <br />NA <br />100 <br />3.8 <br />100 <br />1 3.8 <br />Entry Road <br />0.7 <br />3 <br />NA <br />NA <br />NA <br />NA <br />Haul Road along east side of permit area <br />1.5 <br />3 <br />NA <br />NA <br />NA <br />NA <br />WAPA Powerline Road to north of haul road <br />0.7 <br />3 <br />NA <br />NA <br />NA <br />NA <br />WAPA Powerline Road by Work Area <br />0.7 <br />4 <br />NA <br />NA <br />NA <br />NA <br />East West Haul Road within Mining Area <br />1.5 <br />3 <br />NA <br />NA <br />NA <br />NA <br />Other Haul Roads within Mining Area <br />1.5 <br />3 <br />NA <br />NA <br />NA <br />NA <br />Mining Area south edge (swale and basins) <br />8.3 <br />1.6 <br />7 <br />10 <br />0.2 <br />10 <br />0.2 <br />90 <br />1.4 <br />90 <br />1.4 <br />Mining Area north, west and east edges <br />10.3 <br />1.7 <br />7 <br />10 <br />0.2 <br />10 <br />0.2 <br />100 <br />100 <br />WAPA Won zone <br />0.7 <br />1 <br />1 NA <br />NA <br />NA <br />NA <br />Mining Area, remainder <br />22.5 <br />4.0 <br />1 7 <br />100 <br />4.0 <br />100 <br />4.0 <br />100 <br />4.0 <br />100 <br />4.0 <br />1. In the area column, the upper number is the total acreage, and the lower number is the maximum acreage at <br />one time (if different). In the four columns on the right, the upper numbers are the percentage of total <br />affected area expected to require that task be done, (NOT a percentage of the total amount of that area) and <br />the lower number is the maximum acreage at one time requiring that task.7 <br />2. Work Area (3.8 acres) will not require backfill or grading, but at the end of operations work includes: <br />removing gravel surfacing (to be sold and removed), spreading soil (stored in perimeter stockpiles around the <br />work area) then seeding. The sediment basin will be left but will be soiled and seeded. <br />3. Roads and their fringes are permanent and will remain. Routine maintenance will continue through the <br />mining and reclamation period. No additional work is needed at the end of mining, assuming maintenance is <br />performed in a manner similar to county roads. <br />4. The road along the WAPA powerline adjacent to the Work Area will not be affected or disturbed for mining <br />and is not affected land. <br />5. Swales, berms, and other storm water control features of the edge of the Mining Area will be constructed as <br />mining progresses, using overburden for backfill; as mining is completed in a given area and the area is <br />reclaimed, soil (stored in the berms on the edge) will be spread and seeded. <br />6. Seeding includes application of fertilizer (if applicable) and mulch. <br />7. The largest area to be in active operations (mining and reclamation) is 7.3 acres with an exterior perimeter of <br />1740 linear feet (3.3 acres), of which 1.6 acres is the south (lower edge) and 1.7 acres is the north /west <br />perimeter. This is expected to be in year 3 -4; with less land disturbed before and after. As shown in the table <br />above, the produces the following percentage of the areas requiring reclamation: <br />7 Maximum area to be disturbed at any one time: <br />Location within maximum acreage to be disturbed at anytime in the <br />Area <br />W <br />0 <br />(0 <br />U) <br />life of the operation. <br />(acres) <br />s <br />m <br />= <br />a <br />`D <br />Pit floor <br />4.0 <br />Percentage: <br />100 <br />100 <br />100 <br />100 <br />North and west perimeter <br />1.7 <br />Percentage: <br />10 <br />10 <br />100 <br />100 <br />South edge <br />1.6 <br />Percentage: <br />1 10 <br />1 10 <br />1 0 <br />90 <br />TOTAL <br />7.3 <br />Acres: <br />1 4.3 <br />1 4.3 <br />1 7.1 <br />7.1 <br />