Laserfiche WebLink
1.2.7 Re- Disturbed Reclamation Acres <br />The parcel identification and acres re- disturbed due to mining activities for all previously <br />revegetated areas will be documented here. Table 1.2 will show acres re- disturbed and <br />summarize the bond release status of each parcel. <br />During the summer of 2012 Parcels F- AB -04, 05, 06, 07, 08, 09, 11 were partially re- disturbed <br />to establish a haulroad to topsoil piles F -95 -1 and F -95 -2 on the western edge of Flintlock Pit <br />reclamation. <br />Parcel F -AB -04 had 2.2 acres removed. <br />Parcel F -AB -05 had 0.6 acres removed. <br />Parcel F -AB -06 had 1.8 acres removed. <br />Parcel F -AB -07 had 5.1 acres removed. <br />It had attained Phase II bond release. <br />It had attained Phase II bond release, <br />It had attained Phase II bond release. <br />It had attained Phase I bond release. <br />Parcel F -AB -08 had 0.7 acres removed. It had attained Phase I bond release. <br />Parcel F -AB -09 had 0.4 acres removed. <br />Parcel F -AB -011 had 0.7 acres removed. <br />The areas re- disturbed within these parcels were regraded and topsoiled in 2012, they were <br />also seeded in 2012 and the haulroad corridor has been included in the F -A -12 parcel <br />acreage. <br />FVUBDN /GCR 2/13 <br />[DRMS \12RECtext1 -0] <br />