Mature Shrub Transplant Clumps <br />In 2012, no shrub clumps were constructed. No new shrub clumps are planned for <br />construction in 2013. <br />Drainage Reconstruction <br />Refer to Section 3.0 of this annual report. <br />Contour Ditch Construction <br />During 2012, Trapper constructed contour ditches in Flintlock Pit (Map 1). <br />Stock Tank Construction <br />One new Stock Tank was constructed in East Flintlock Pit during the 2012 field season. Refer <br />to Section 6. <br />Stock Tank Reclamation <br />No Stock Tanks were reclaimed during the 2012 field season. Refer to Section 6. <br />Developmental Drill Sites <br />During the 2012 Developmental Drilling season nine holes were drilled within the permit <br />boundary, four in the Ashmore area and five in the M -Pit area. <br />All applicable developmental drill holes were abandoned per permit section 3.3.2 and are <br />reclaimed and seeded per section 3.6.3.5 of the permit. Drill hole abandonment typically uses <br />Alternative 2 for sealing of the borehole. <br />Topsoil Piles <br />Refer to Section 5. Topsoil stockpiles were sloped and seeded to the approved 2012 <br />temporary seed mix. Approximately 4.8 acres were treated. <br />Sediment Dams <br />Middle Flume #1 (inlet), Johnson #6, #7, #8, #9,and #10R, No Name #4, West Pyeatt #1, Horse <br />#1 and Oak #1 ponds were cleaned or partially cleaned during 2012. <br />1.2.6 Previously Revegetated Acres <br />The locations and acres for all previously revegetated areas, seeded to perennial species, are <br />presented in Map(s) 1. To date, Trapper has revegetated approximately 3,887.4 acres (153.5 <br />acres in 2012) within the boundaries of active mining and has revegetated an additional 516.0 <br />acres within the permit boundary but outside topsoil stripping limits. Of the total revegetated <br />acres, 3243.1 reclaimed acres have received final phase III bond release. <br />Not shown on Map(s) 1 in this annual report are the areas seeded to temporary perennial <br />mixes that will require final reclamation prior to the end of the project (life of mine). <br />