Laserfiche WebLink
Section 6.0 Import of Material <br />The pit will accept concrete and asphalt materials that have been removed from existing sites in <br />order that they can be recycled through the plants on site. Fill material may also be accepted into <br />the mine site. Fill material will be spread out on the mined out pit floor and will be blended into <br />the final landscape. Some fill may be used to backfill highwall areas. Some material may also be <br />re -sold as construction material. <br />Dead trees may also be accepted by the site. Any trees brought in will be chipped into mulch and <br />will either be sold or will be used as mulch in the reclamation of the site. The designated tree stor- <br />age area and chipped material storage area are shown on Map C -2. <br />No material of any type can be accepted by the Operator unless the attached form is filled out by <br />the entity bringing the material to the site. The form provides an assurance that all material brought <br />to the site is inert and has no toxic or acid forming material above acceptable limits. <br />Gloria Z Mine 2013 Amendment 15 <br />