Laserfiche WebLink
Mr. Todd Williams <br />G.L. SWSP <br />May 15, 2013 <br />Page 4 <br />deadline of July 28, 2013 to complete backfilling at this site and will required to extend <br />this date with DRMS should backfilling not be complete by this time. Renewal of this plan <br />is contingent on the Applicant demonstrating continued backfilling operations are <br />occurring and that they continue to be in compliance with their DRMS permit. <br />10. To assure that depletions from groundwater evaporation do not occur in the unforeseen <br />event, or events, that would lead to the abandonment of the pit, a bond for $116,700.00 <br />through DRMS for lining or backfilling of the pit has been obtained. Therefore, in case of <br />abandonment the bond can finance the completion of the lining of the pit or the <br />backfilling, thus preventing depletions to the stream system. <br />11. In accordance with amendments to §25 -8- 202(7), C.R.S., and "Senate Bill 89 -181 Rules <br />and Regulations" adopted on February 4, 1992, the State Engineer shall determine <br />whether the substitute supply is of a quality to meet requirements of use to senior <br />appropriators. As such, water quality data or analysis may be requested at any time to <br />determine if the water quality is appropriate for downstream water users. <br />12. The decision of the state engineer shall have no precedential or evidentiary force, shall <br />not create any presumptions, shift the burden of proof, or serve as a defense in any <br />pending water court case or any other legal action that may be initiated concerning this <br />plan. This decision shall not bind the state engineer to act in a similar manner in any <br />other applications involving other plans, or in any proposed renewal of this plan, and <br />shall not imply concurrence with any findings of fact or conclusions of law contained <br />herein, or with the engineering methodologies used by the Applicant. <br />If you have any questions concerning this approval, please contact Joanna Williams in <br />Denver at (303) 866 -3581 or Jonathan Hernandez in Greeley at (970) 352 -8712. <br />Sincerely, <br />Jeff D atherage, P.E. <br />of Water Supply <br />Attachments: Tables 1 & 2 <br />Lake Canal Reservoir Company Lease <br />Administration Protocol `Augmentation Plan Accounting, Division One — South Platte River" <br />cc: Jonathan Hernandez, Water Resource Engineer, Jonathan .hernandez(aD-state.co.us <br />810 9`h Street, Ste. 200, Greeley, CO 80631 (970) 352 -8712 <br />Mark Simpson, Water Commissioner, Water District 3, mark. simpson .state.co.us <br />951 Wheatridge Cir, Loveland, CO 80537; (970) 420 -9568 <br />Division of Reclamation, Mining and Safety <br />JD /jmh/ GL Pit renewal M81- 022(13).docx <br />