Laserfiche WebLink
Mr. Todd Williams Page 3 <br />G.L. SWSP <br />May 15, 2013 <br />137(11), C.R.S., subject to the following conditions: <br />1. This plan is approved with the effective date of June 1, 2013 through May 31, 2014 unless <br />otherwise revoked or modified. If the groundwater pond has not been completely <br />backfilled and lagged depletions to the stream system have not ceased by the plan's <br />expiration date, a renewal request must be submitted to this office with the statutory fee <br />(currently $257) no later than April 15, 2014. <br />2. Well permit no. 42334 -F was obtained for the current use and exposed pond surface <br />area of the gravel pit, in accordance with §37 -90- 137(2) and (11), C.R.S. Applicant shall <br />operate the gravel pit in accordance with the conditions of approval of permit no. <br />42334 -F. <br />3. The total surface area of exposed groundwater must not exceed 1.67 acres resulting in <br />4.23 acre -feet of evaporative loss. Should the total consumption at the pit exceed this <br />amount, The Applicant is required to file an amendment with this office. <br />4. Approval of this plan is for the purpose as stated herein. Any additional uses for which <br />the water may be used must first be approved by this office. <br />5. All releases of replacement water must be sufficient to cover all out -of- priority depletions <br />in time, place, and amount and must be made under the direction and /or the approval of <br />the water commissioner. The release of replacement water may be aggregated to <br />maximize beneficial use. The water commissioner and /or the division engineer shall <br />determine the rate and timing of an aggregated release. <br />6. The replacement water that is the subject of this plan cannot be sold or leased to any <br />other entity. As a condition of subsequent renewals of this substitute water supply plan, <br />the replacement water must be appurtenant to this site until the groundwater pond has <br />been completely backfilled and the lagged depletions to the stream system have ceased. <br />A copy of this approval letter should be recorded with the county clerk and recorder. All <br />replacement water must be concurrent with depletions in quantity, timing and location. <br />7. The name, address, and phone number of the contact person who will be responsible for <br />the operation and accounting of this plan must be provided on the accounting forms <br />submitted to the division engineer and the water commissioner. <br />8. Adequate accounting of depletions and replacement must be provided to the division <br />engineer in Greeley (Div1Accountinq(@state.co.us) and the water commissioner (Mark <br />Simpson at Mark. Simpson(d)-state.co.us) on a monthly basis. Accounting forms are <br />subject to modification and approval by the division engineer. Submitted accounting shall <br />conform to the Administration Protocol "Augmentation Plan Accounting, Division One — <br />South Platte River" (attached). <br />9. This substitute water supply plan may be revoked or modified at any time should it be <br />determined that injury to other vested water rights has or will occur as a result of this <br />plan. <br />10. Connell Resource, Inc. has amended their DRMS permit to account for the gradual <br />backfilling of the site. Replacement of lagged depletions must continue until there is no <br />longer an effect on stream flow. Approval of this substitute water supply plan does not <br />relieve the Applicant and /or the landowner of the requirement to obtain a water court <br />decree approving a permanent plan for augmentation or mitigation to ensure the <br />permanent replacement of all depletions, including long -term evaporation losses and <br />lagged depletions after gravel mining has ceased. The Applicant currently has a <br />