My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-05-10_REVISION - M1977193 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977193
>
2013-05-10_REVISION - M1977193 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:45:58 PM
Creation date
5/13/2013 7:49:04 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977193
IBM Index Class Name
REVISION
Doc Date
5/10/2013
Doc Name
Preliminary Adequacy Review Reponse.
From
Azurite, Inc.
To
DRMS
Type & Sequence
AM5
Email Name
TC1
TCW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br />Phase One mining will result in approximately 35 acres of highwall development and 45 acres of pit <br />floor disturbance. At total build out, up to 65 acres of highwall development and up to 90 acres of pit <br />floor disturbance is estimated. <br />(e) An approximate timetable to describe the mining operation. The timetable is for the purpose of <br />establishing the relationship between mining and reclamation during the different phases of a mining <br />operation. An Operator /Applicant shall not be required to meet specific dates for initiation, or completion <br />of mining in a phase as may be identified in the timetable. This does not exempt an Operator /Applicant <br />from complying with the performance standards of Section 3.1. If the operation is intended to be an <br />intermittent operation as defined in Section 34- 32.5- 103(11)(b), C.R.S., the Applicant should include in <br />this exhibit a statement that conforms to the provisions of Section 34- 32.5- 103(11)(b), C.R.S. Such <br />timetable should include: <br />(i) an estimate of the periods of time which will be required for the various stages or phases of the <br />operation; <br />(ii) a description of the size and location of each area to be worked during each phase; and <br />(iii) outlining the sequence in which each stage or phase of the operation will be carried out. <br />(Timetables need not be separate and distinct from the mining plan, but may be incorporated <br />therein.) <br />The life of mine of this deposit is approximately seventy (70) years. Due to the highwall mining <br />technique employed, the mining zone, including stockpile areas, will stay basically in the same area <br />through the life of the mine. While this will keep the mining area in a defined zone with some <br />movement of the working face to the northern and western portions of the mining affected lands, <br />reclamation of the lower reaches of the mining site will not occur until near the end of the life of <br />mine. Reclamation of the highwall areas as described in the 1997 submittal and resubmitted with this <br />application will reflect the stormwater drainage and highwall configurations as planned and will be <br />performed as the granite rock highwall producing face is worked back to the affected land boundaries <br />to the west. At the time of location of lower storm water detention ponds, a technical revision will be <br />tendered to the Division for review and approval. This may not occur for 20 — 30 years from present. <br />MD41NG PHASE TIMETABLE <br />Time Estimate <br />Estimated Disturbance of Affected Land <br />(mining-reclamation) <br />2013 <br />Approval of Amended acreage and initiation of development work at upper <br />elevation of newly permitted area, southern 10 acres of newly leased land. <br />2013 -2017 <br />Highwall mining focused on 10 acre (m/1) area at SE corner of the lease <br />area, 660'x660' on side. Mining will progress east to west to western <br />border of lease area. <br />2017 -2037 <br />Highwall mining to progress south to north to northern end of the lease <br />area. <br />2037 -2057 <br />Mining of pit floor to 5550' elevation. Mining of highwall areas to north <br />and pit floor may be concurrent depending on business needs and costs. <br />Process fines will used for planting medium in concert with other soil <br />amendments /additions for re- vegetation of the pit floor areas. <br />
The URL can be used to link to this page
Your browser does not support the video tag.