Laserfiche WebLink
will be shipped off site for crushing and testing. As in the 2019 mining cycle <br />approximately 1,000 cubic yards of minus1 /2 inch material from the offsite crushing <br />operation will be returned to the mine site and blended with overburden. After the <br />rubblized material is hauled from the 60 foot by 60 foot by 40 foot, 2020 mined area <br />reclamation operations for Reclamation Area #3 and the remainder of affected land will <br />commence (Map E12). <br />Exhibit C attachments: <br />Table Cl <br />Overburden Map E3 <br />Phase 1 Map E4 <br />Phase 2 Map E5 <br />Phase 3 Map E6 <br />Phase 4 Map E7 <br />Phase 5 Map E8 <br />Phase 6 Map E9 <br />Phase 7 Map E10 <br />Phase 8 Map E11 <br />Final Grading Map E12 <br />Drainage Report (100 Year Flood) <br />