Laserfiche WebLink
Estimated Reclamation Costs for Vollmer Pit <br />Prepared: May 2013 <br />For temporary cessation notice <br />Current Bond Amount: $23,560.00 <br />Current Unreclaimed Land: 12.2 acres <br />Facilities Removal: <br />Destroy and Remove Scale House: <br />hours = <br />3 <br />a: knock down cinder block walls <br />cost/hour <br />$325.00 <br />b: haul away <br />total <br />$975.00 <br />Remove electrical facilities: <br />hours = <br />4 <br />cost/hour <br />$150.00 <br />total <br />$600.00 <br />Bury remaining materials <br />a: scrape nearby surface (dozer) <br />hours = <br />6 <br />b: push over scale site <br />cost/hour <br />$350.00 <br />total <br />$2,100.00 <br />Total Facilities Removal = <br />Topsoil unreclaimed area: <br />Average Depth of soil: <br />Volume of soil: <br />Cost/cubic yard <br />Total Cost = <br />Revegetate unreclaimed area: <br />Drill seed topsoiled land <br />Total Cost = <br />Weed Control for 4 years: <br />Total Cost = <br />Total Estimated Reclamation Cost <br />difference from bond amount <br />$3,675.00 <br />7 inches <br />0.58 feet <br />11,416 cubic yards <br />$1.05 <br />$11,986.74 <br />$275.00 per acre <br />$3,355.00 <br />125 per acre <br />$1,525.00 <br />$20,541.74 <br />$3,018.26 <br />