Laserfiche WebLink
ROADABLE EQUIPMENT sheet 2 of 2 <br />Machine <br />Description <br />Total <br />Cost/hour/unit <br />Fleet Size <br />(No. units) <br />Haul Trip <br />Cost/hr/fleet <br />Return Trip <br />Cost/hr/fleet <br />- Flatbed Truck, 4x2, 30K G VW <br />$58.37 <br />1 <br />$58.37 <br />$58.37 <br />-Light Duty Pickup, 04, 314 T. <br />$46.40 <br />1 <br />$46.40 <br />$46.40 <br />-Fuel Tanker, 4x2, 170 HP <br />$63.62 <br />1 <br />$63.62 <br />$63.62 <br />-tube Truck, OZ 170 HP <br />$71.52 <br />1 <br />$71.52 <br />$71.52 <br />Subtotals :1 <br />$239.91 <br />$239.91 <br />EQUIPMENT HA'Ul. DISTANCE and TIME <br />Transportation Cycle Time: Non- <br />Roadable <br />Nearest major city or town within project area region <br />Total one-way travel distance <br />Roadable Average travel speed <br />Haul time (hours) = 0.17 <br />0.17 <br />Return time (hours) = <br />0.17 <br />0.17 <br />Loading time (hours) = <br />1.00 <br />NA <br />Unloading time (hours) = <br />1.00 <br />NA <br />Subtotals = <br />2.33 <br />0.33 <br />Total non-roadable mob/demob cost <br />• two round Irlps with haul rig <br />Total roadable mob/demob cost ** : <br />•• one round trip, no haul dg <br />Leadville <br />5.0 miles <br />30.0 mph <br />$1,612.03 <br />$79.97 <br />.... . ... . <br />JOB TIME AND COST Total job time 4.67 hours <br />Total job cost: $1,692 <br />......... <br />