My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-05-02_PERMIT FILE - M2013026 (10)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2013026
>
2013-05-02_PERMIT FILE - M2013026 (10)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:20:08 PM
Creation date
5/8/2013 11:11:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2013026
IBM Index Class Name
Permit File
Doc Date
5/2/2013
Doc Name
New 110(2) Application, Part 1
From
Lockland, LLC
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ROADABLE EQUIPMENT sheet 2 of 2 <br />Machine <br />Description <br />Total <br />Cost/hour/unit <br />Fleet Size <br />(No. units) <br />Haul Trip <br />Cost/hr/fleet <br />Return Trip <br />Cost/hr/fleet <br />- Flatbed Truck, 4x2, 30K G VW <br />$58.37 <br />1 <br />$58.37 <br />$58.37 <br />-Light Duty Pickup, 04, 314 T. <br />$46.40 <br />1 <br />$46.40 <br />$46.40 <br />-Fuel Tanker, 4x2, 170 HP <br />$63.62 <br />1 <br />$63.62 <br />$63.62 <br />-tube Truck, OZ 170 HP <br />$71.52 <br />1 <br />$71.52 <br />$71.52 <br />Subtotals :1 <br />$239.91 <br />$239.91 <br />EQUIPMENT HA'Ul. DISTANCE and TIME <br />Transportation Cycle Time: Non- <br />Roadable <br />Nearest major city or town within project area region <br />Total one-way travel distance <br />Roadable Average travel speed <br />Haul time (hours) = 0.17 <br />0.17 <br />Return time (hours) = <br />0.17 <br />0.17 <br />Loading time (hours) = <br />1.00 <br />NA <br />Unloading time (hours) = <br />1.00 <br />NA <br />Subtotals = <br />2.33 <br />0.33 <br />Total non-roadable mob/demob cost <br />• two round Irlps with haul rig <br />Total roadable mob/demob cost ** : <br />•• one round trip, no haul dg <br />Leadville <br />5.0 miles <br />30.0 mph <br />$1,612.03 <br />$79.97 <br />.... . ... . <br />JOB TIME AND COST Total job time 4.67 hours <br />Total job cost: $1,692 <br />......... <br />
The URL can be used to link to this page
Your browser does not support the video tag.