My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-05-02_PERMIT FILE - M2013026 (10)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2013026
>
2013-05-02_PERMIT FILE - M2013026 (10)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:20:08 PM
Creation date
5/8/2013 11:11:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2013026
IBM Index Class Name
Permit File
Doc Date
5/2/2013
Doc Name
New 110(2) Application, Part 1
From
Lockland, LLC
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimatina Software <br />EQUIPMENT MOBILIZATION I DEMOBILIZATION, ... <br />PROJECT IDENTIFICATION sheet I of 2 <br />Anencv or organization name: DRMS <br />Task # : 008 <br />Date: I1/1612007 <br />User: ESC <br />State : Colorado <br />County :Lake <br />Site: Hopemore Shaft <br />Permit/Job #:M-1990-057 <br />Abbreviation :none <br />Filename :M057 -008 <br />Permit or other job action :Reevaluate Amount Of Required Bond <br />Task descdpuon:MobilizationIDemobilization <br />I er da <br />EQUIPMENT TRANSPORT RIG CO Shift basis: p y Cost data source -:Z5R_GData <br />Truck tractor description :Genetic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description :Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 1007) <br />Cost Breakdown <br />Available rig capacities: 0-25 Tons 26-50 Tons 51+ Tons — <br />Ownership costlhour: $16.63 $18.37 $22.33 _ <br />Operating cost/hour: $44.38 $46.13 — $50.07 <br />Operator cost/hour: $27-6-6 — i27-66 $27.66 <br />Helper costfhour.1 $0.00 $25.39 $25.39 <br />h - $88.67 $117.55 $125.45 <br />Total unit Cosu <br />Cost/hour NON. DAD= C!dUI!:WV- Weight/unit Ownership Haul Rig Fleet Size Haul Trip Return Trip DOT permit <br />Machine units) Cost/hr/fleet Cost/hr /fleet Cost/fleet <br />Description (Tons) Cost/hr /unit Cost/hr /unit _(No. - <br />-Cat D8R Series 11- 8SU (20, 52.55 $50.32 $125.45 1 $175.77 $125.45 $0.00 <br />-Reve letation Eq. 40.00 $60.00 $117.55 1 $177.55 $117.55 $0.00 <br />Subtotals $353-32 $243.00 $0-00 <br />Total unit Cosu <br />Cost/hour NON. DAD= C!dUI!:WV- Weight/unit Ownership Haul Rig Fleet Size Haul Trip Return Trip DOT permit <br />Machine units) Cost/hr/fleet Cost/hr /fleet Cost/fleet <br />Description (Tons) Cost/hr /unit Cost/hr /unit _(No. - <br />-Cat D8R Series 11- 8SU (20, 52.55 $50.32 $125.45 1 $175.77 $125.45 $0.00 <br />-Reve letation Eq. 40.00 $60.00 $117.55 1 $177.55 $117.55 $0.00 <br />Subtotals $353-32 $243.00 $0-00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.