Holcim's general plans for the resumption of mining at the Ranch Land site are as follows: <br />1. Complete mining operations at the Bear Creek Mine. Timing for the completion of mining <br />operations at the Bear Creek mine are dependant on ecomonic factors. <br />2. Obtain a modified DRMS operating permit to allow for limestone extraction from the Ranch <br />Land site to supply the cement plant. The permit modification will include details outlining <br />the size and scope of the mine operation at the Ranch Land site. <br />3. Resume mine operations once construction of the new minesite is complete. It is <br />anticipated that the size and scope of the operation would be similar to Holcim's existing <br />mine operations at the Bear Creek Mine <br />While the Ranch Land site is in Temporary Cessation, Holcim will ensure reclamation <br />requirements related to rule 3.1 are in place and maintained. <br />The existing Financial Warranty for the property is in the amount of $43,500. This amount was <br />determined to be sufficient based on the scope of disturbance outlined by the previous operation. <br />Since the amount of disturbance will not increase from what is currently existing at the site, <br />Holcim believes the current Financial Warranty is sufficient at this time. <br />In addition and as required, Holcim will continue to file the proper annual reports and fees as <br />required to keep this permit in place. <br />Should you have any questions or require additional information please do not hesitate to contact <br />me at (719) 784 -1209. Thank you for your attention to this request. <br />Sincerely, <br />Joe Lamanna <br />Quarry Manager <br />Holcim (US) Portland Plant <br />Cc: Justin Andrews, Environmental Manager, Portland Plant, Holcim (US) Inc. <br />Sergio Martinez, Plant Manager, Portland Plant, Holcim (US) Inc. <br />