Laserfiche WebLink
RECLAMATION-PLANT GROWTH MEDIUM <br />• <br />All stockpiled plant growth medium plus the suitable overburden/sediment <br />pond material to be used in reclamation will be tested for the following parameters: <br />1. pH <br />2. Conductivity <br />3. Texture (particle size distribution) <br />4. Sodium absorption ratio <br />5. Saturation percentage <br />6. If pH is over 8, test will be made for selenium and boron. <br />7. Fertilization: <br />Nitrogen <br />Phosphorus <br />Potassium <br />8. Suitability as a plant growth material. <br />• <br />• <br />Plant growth medium shall be placed to a finished depth of 6 inches over all <br />graded and backfilled areas. Plant growth medium placement operations will be <br />completed in conjunction with processing backfill and grading operations to assure <br />uniform distribution of plant growth medium over all exposed areas. When backfill <br />operations reach a maximum height of 10 vertical feet, plant growth medium shall <br />be applied to that slope area to within 2 feet of the top of the existing bench. Brows <br />or overhangs shall be rounded to conform to the existing surrounding terrain and <br />plant growth medium applied thereto. <br />The bulk of the fill for reclamation of the disturbed mine area will be produced <br />by re-contouring the slopes in such a manner as to leave on the surface those <br />materials determined to be most easily amended to satisfactory plant growth. <br />Additional soil will be taken from a borrow area in the east drainage area below the <br />plateau (Topsoil Borrow Area). For a description of this material and explanation of <br />source and intended disposition see Section 2.04.9 and Appendix 12(3). <br />Coverage of the permit area with plant growth medium for re-seeding and <br />plant growth will be as follows: <br />Location Soil De th <br />Access road and areas not to be <br />reclaimed None <br />Pond Area Area 1 None exce t material found durin reclamation <br />Lower Facilities Area Area 2 None exce t material found durin reclamation <br />All other areas to be reclaimed U to 6 inches 6 inches minimum on refuse ile <br />.~,~,~,~~,~,.~~.~,,~,~,~„®,®~~,~~~,~,~,~,.~,~,~,m,~,,~,.~,~~~,~,~,~,,~,~,®~~,~-„~,.~,~,~,.~,~,~,~,.~,.~,~,.~,,~,®,~,~~~,w,~,.~,~,w~.~,.~,~,~,~~~,.~,®,®,~,.~,.~,.~,~,~,~,~,~,.~,~,~,®,~,~,.~~w~~,~ <br />National King Coal, LLC King I Mine <br />Section 2.05.4 <br />Page 6 February, 2007 <br />