My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-04-15_REVISION - C1981038 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981038
>
2013-04-15_REVISION - C1981038 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:19:31 PM
Creation date
4/19/2013 7:08:00 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Revision
Doc Date
4/15/2013
Doc Name
Proposed Decision Letter & Form and Cost Estimate
From
DRMS
To
Bowie Resources
Type & Sequence
SL4
Email Name
BFB
SB1
SLB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cost Summary Worksheet Cont'd Task # 001 Page 95 of 118 <br />MISCELLANEOUS TRUCK WORK <br />Task description: Water Truck for Backfill Moisture Augmentation <br />Permit Action: Bond Release 4 <br />Site: Bowie No. 1 Mine (SL -4) Permit /Job #: C1981038 <br />PROJECT IDENTIFICATION <br />Task #: 155 State: Colorado <br />Date: 12/31/2012 County: Delta <br />User: BFB <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Make and Model: Water Tanker, 5,000 Gal. <br />Attachment 1: <br />Attachment 2: <br />Labor Unit 1: Flatbed Driver - 2+ rear axles <br />Labor Unit 2: <br />Cost Breakdown: <br />JOB TIME AND COST <br />Fleet size: 2 Truck(s) <br />Unit cost: $177.71 /Hour <br />Abbreviation: None <br />Filename: C038 -155 <br />Horsepower: <br />175 <br />Utilization % <br />Ownership Cost /Hour: <br />$20.80 <br />NA <br />Operating Cost /Hour: <br />$46.55 <br />100 <br />Operator Cost/Hour: <br />$21.51 <br />NA <br />Total Unit Cost/Hour: <br />$88.85 <br />Total Fleet Cost /Hour: <br />$177.71 <br />JOB TIME AND COST <br />Fleet size: 2 Truck(s) <br />Unit cost: $177.71 /Hour <br />Abbreviation: None <br />Filename: C038 -155 <br />Horsepower: <br />175 <br />Shift Basis: <br />1 per day <br />Weight: <br />15.00 <br />Total job time: 225.00 <br />Total job cost: $39,985.00 <br />(US Tons) <br />Hours <br />CIRCES Cost Estimating Sofiivare <br />
The URL can be used to link to this page
Your browser does not support the video tag.