Laserfiche WebLink
Cost Summary Worksheet Cont'd Task # 001 Page 94 of 11S <br />Transportation Cycle Time: <br />Haul Time (Hours): <br />Return Time (Hours): <br />Loading Time (Hours): <br />Unloading Time (Hours): <br />Subtotals: <br />JOB TIME AND COST <br />Total Roadable Mob /Demob Cost ** <br />** one round trip, no haul rig: <br />Non - Roadable <br />Equipment <br />Readable <br />Equipment <br />2.57 <br />2.57 <br />2.57 <br />2.57 <br />0.00 <br />NA <br />0.00 <br />NA <br />5.14 <br />5.14 <br />Total job time <br />Total job cost: <br />$1,311.94 <br />10.29 Hours <br />$17,619.14 <br />CIRCES Cost Estimating Sofiivare <br />