Laserfiche WebLink
Cost Summary Worksheet Cont'd Task # 001 <br />Average Travel Speed <br />Total Non - Roadable Mob /Demob Cost * <br />`* two round trips with haul rig: <br />Total Roadable Mob /Demob Cost ** <br />** one round trip, no haul rig: <br />Transportation Cycle Time: <br />Haul Time (Hours): <br />Return Time (Hours): <br />Loading Time (Hours): <br />Unloading Time (Hours): <br />Subtotals: <br />JOB TIME AND COST <br />Non - Roadable <br />Equipment <br />Roadable <br />Equipment <br />2.57 <br />2.57 <br />2.57 <br />2.57 <br />0.00 <br />NA <br />0.00 <br />NA <br />5.14 <br />5.14 <br />Page 90 of 118 <br />35.00 mph <br />$3,431.29 <br />$922.89 <br />Total job time: 10.29 Hours <br />Total job cost: $4,354.18 <br />CIRCES Cost Estimating Sofiivare <br />