Laserfiche WebLink
Cost Summary Worksheet Cont'd Task # 001 Page 89 of 118 <br />EQUIPMENT MOBILIZATION/DEMOBILIZATION <br />Task description: Mobilize /Demobilize Equipment for Pond Cleaning <br />Site: Bowie No. 1 Mine Permit Action: Bond Release 4 (SL -4) Permit /Job #: C1981038 <br />PROJECT IDENTIFICATION <br />Task #: 147 State: Colorado <br />Date: 12/19/2012 County: Delta <br />User: BFB <br />Agency or organization name: DBMS <br />EQUIPMENT TRANSPORT RIG COST <br />Abbreviation: None <br />Filename: C038 -147 <br />Shift basis: 1 per day <br />Cost Data Source: CRG Data <br />Truck Tractor Description: GENERIC ON- HIGHWAY TRUCK TRACTOR, 6X4, DIESEL POWERED, <br />400 HP (2ND HALF, 2006) <br />Truck Trailer Description: GENERIC FOLDING GOOSENECK, DROP DECK EQUIPMENT TRAILER <br />(25T, 50T, AND 100T) <br />Cost Breakdown: <br />Available Rig Capacities <br />0 -25 Tons <br />26 -50 Tons <br />51+ Tons <br />Ownership Cost /Hour: <br />$16.63 <br />$18.37 <br />$22.33 <br />Operating Cost /Hour: <br />$44.38 <br />$46.13 <br />$50.07 <br />Operator Cost /Hour: <br />$27.66 <br />$27.66 <br />$27.66 <br />Helper Cost/Hour: <br />$0.00 <br />$25.39 <br />$25.39 <br />Total Unit Cost/Hour: <br />$88.67 <br />$117.55 <br />$125.45 <br />NON ROADABLE EQUIPMENT: <br />Machine <br />Weight/ <br />Owner ship <br />Haul Rig <br />Fleet <br />Haul Trip <br />Return Trip <br />DOT Permit <br />Description <br />Unit <br />Cost/hr/ unit <br />Cost/hr /unit <br />Size <br />Cost /hr/ <br />Cost /hr/ fleet <br />Cost/ fleet <br />$56.20 <br />(TONS) <br />$56.20 <br />$56.20 <br />Light Duty Pickup, 4x4, 1 T. Crew <br />fleet <br />1 <br />$25.30 <br />Cat 336D L 10' -6" <br />32.23 <br />$42.44 <br />$117.55 <br />1 <br />$159.99 <br />$117.55 <br />$250.00 <br />Stick <br />CAT 446D <br />9.80 <br />$17.87 <br />$88.67 <br />1 <br />$106.54 <br />$88.67 <br />$250.00 <br />Subtotals: 5266.53 $206.22 5500.00 <br />ROADABLE EQUIPMENT: <br />Machine Description <br />Total Cost/hr/ unit <br />Fleet Size <br />Haul Trip <br />Cost/hr/ fleet <br />Return Trip <br />Cost/hr/ fleet <br />Flatbed Truck, 6x4, 45K GVW <br />$55.51 <br />1 <br />$55.51 <br />$55.51 <br />Fuel Tanker, 6x4,210 HP <br />$42.44 <br />1 <br />$42.44 <br />$42.44 <br />Lube Truck, 6x4, 210 HP <br />$56.20 <br />1 <br />$56.20 <br />$56.20 <br />Light Duty Pickup, 4x4, 1 T. Crew <br />$25.30 <br />1 <br />$25.30 <br />$25.30 <br />Subtotals: $179.45 $179.45 <br />EQUIPMENT HAUL DISTANCE and Time <br />Nearest Major City or Town within project area region: GRAND JUNCTION <br />Total one -way travel distance: 90.00 miles <br />CIRCES Cost Estimating Sofiivare <br />