Laserfiche WebLink
Cost Summary Worksheet Cont'd Task # 001 Page 7 of 118 <br />Dozing method: <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />1.000 <br />(GEN.) <br />1.000 <br />(AVG.) <br />0.830 <br />(1 SHIFT/DAY) <br />0.800 <br />(FND -RF) <br />0.786 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.793 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.2794 <br />Adjusted unit production: <br />Adjusted fleet production: <br />JOB TIME AND COST <br />767.99 LCY /hr <br />3071.96 LCY/hr <br />Fleet size: 4 Dozer(s) <br />Unit cost: $0.445/LCY <br />Total job time: <br />Total job cost: <br />3.54 Hours <br />$4,835.97 <br />CIRCES Cost Estimating Sofiivare <br />