My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-04-15_REVISION - C1981038 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981038
>
2013-04-15_REVISION - C1981038 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:19:31 PM
Creation date
4/19/2013 7:08:00 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Revision
Doc Date
4/15/2013
Doc Name
Proposed Decision Letter & Form and Cost Estimate
From
DRMS
To
Bowie Resources
Type & Sequence
SL4
Email Name
BFB
SB1
SLB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cost Summary Worksheet Cont'd Task # 001 Page 8 of 118 <br />Task description: C <br />Site: Bowie No. 1 Mine <br />PROJECT IDENTIFICATION <br />COMPACTION WORK <br />OVWM Road Backfill <br />Permit Action: Bond Release 4 (SL -4) <br />Task #: 033 State: Colorado <br />Date: 12/19/2012 County: Delta <br />User: BFB <br />Agency or organization name: DRMS <br />Permit /Jobt C1981038 <br />Abbreviation: None <br />Filename: C038 -033 <br />HOURLY EQUIPMENT COST <br />Basic Machine: CAT 815F Horsepower: 240 <br />Compactor Type: Soil - tamping foot Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br />MATERIAL OUANTITIES <br />Loose volume: 20,238 LCY <br />Compacted volume: 17,607 CCY <br />Source of estimated volume: 1988 Operator Estimate <br />Source of estimated shrinkage factor: Cat Handbook <br />HOURLY PRODUCTION <br />Compacted width per pass (W): <br />Average Compactor Speed (S): <br />Compacted thickness of each lift (L): <br />Conversion Constant (C): <br />Required number of machine passes (P): <br />Unadjusted Hourly Unit Production: <br />Job Condition Correction Factors <br />Shrinkage factor: 0.870 <br />Unadjusted hourly production — (W x S x L x Cl / P <br />6.50 <br />feet <br />4.00 <br />Utilization % <br />Ownership Cost /Hour: <br />$36.81 <br />16.3 <br />NA <br />Operating Cost /Hour: <br />$79.64 <br />847.60 <br />100 <br />Operator Cost /Hour: <br />$23.76 <br />NA <br />Total Unit Cost/Hour: <br />$140.21 <br />Total Fleet Cost /Hour: <br />$140.21 <br />MATERIAL OUANTITIES <br />Loose volume: 20,238 LCY <br />Compacted volume: 17,607 CCY <br />Source of estimated volume: 1988 Operator Estimate <br />Source of estimated shrinkage factor: Cat Handbook <br />HOURLY PRODUCTION <br />Compacted width per pass (W): <br />Average Compactor Speed (S): <br />Compacted thickness of each lift (L): <br />Conversion Constant (C): <br />Required number of machine passes (P): <br />Unadjusted Hourly Unit Production: <br />Job Condition Correction Factors <br />Shrinkage factor: 0.870 <br />Unadjusted hourly production — (W x S x L x Cl / P <br />6.50 <br />feet <br />4.00 <br />mph <br />8.00 <br />inches <br />16.3 <br />(5,280ft. /12in. /27cu.ft.) <br />4 <br />passes <br />847.60 <br />CCY/hour <br />Site Altitude: <br />6,800 feet <br />Source <br />Altitude Adj : 1.00 (CAT HB) <br />Job Efficiency: 0.83 (1 shift /day) <br />Net Correction: 0.8300 multiplier <br />Adjusted Hourly Unit Production: <br />Adjusted Hourly Fleet Production: <br />JOB TIME AND COST <br />Fleet size: 1 Compactor(s) <br />Unit cost: $0.199 per CCY <br />703.51 <br />703.51 <br />CCY /Hour <br />CCY /Hour <br />Total job time: 25.03 Hours <br />Total job cost: $3,509.00 <br />CIRCES Cost Estimating Sofiivare <br />
The URL can be used to link to this page
Your browser does not support the video tag.