Laserfiche WebLink
Cost Summary Worksheet Cont'd Task # 001 Page 77 of 118 <br />Surface <br />removal - 4 to 10 in. <br />diameter steel pipe <br />LF <br />Drill Rig Time <br />ATLAS COPCO <br />na <br />na <br />16.00 <br />EA <br />$145.92 <br />$2,334.72 <br />ROC D3- 01,3.0 in. <br />Water Truck <br />Water Tanker, 5,000 <br />na <br />na <br />16.00 <br />EA <br />$67.30 <br />$1,076.80 <br />Time <br />Gal. <br />Bottom Plug <br />PVC plug - 10 in. <br />10 <br />na <br />3.00 <br />EA <br />$96.54 <br />$289.62 <br />Ex. Holes TR- <br />diameter borehole <br />49 & MR -124 <br />Fill Holes with <br />Portland cement <br />na <br />na <br />1,065.00 <br />bag <br />$11.50 <br />$12,247.50 <br />Concrete <br />grout ( Bag, material <br />cost only ... 94 lb. bag) <br />Borehole <br />Borehole <br />na <br />na <br />3.00 <br />EA <br />$2.81 <br />$8.43 <br />Marker <br />location /identification <br />marker (EA, material <br />cost only) <br />Cut Casing at <br />Exposed casing <br />10 <br />na <br />8.00 <br />LF <br />$5.87 <br />$46.96 <br />Surface <br />removal - 4 to 10 in. <br />diameter steel pipe <br />(LF) <br />Drill Rig Time <br />ATLAS COPCO <br />na <br />na <br />48.00 <br />EA <br />$145.92 <br />$7,004.16 <br />ROC D3- 01,3.0 in. <br />Water Truck <br />Water Tanker, 5,000 <br />na <br />na <br />48.00 <br />EA <br />$67.30 <br />$3,230.40 <br />Time <br />Gal. <br />Bottom Plug <br />PVC plug - 6 in. <br />6 <br />na <br />2.00 <br />EA <br />$51.44 <br />$102.88 <br />TR -50 <br />diameter borehole <br />Fill Holes with <br />Portland cement <br />6 <br />na <br />137.00 <br />bag <br />$11.50 <br />$1,575.50 <br />Concrete <br />grout ( Bag, material <br />cost only ... 94 lb. bag) <br />Borehole <br />Borehole <br />na <br />na <br />2.00 <br />EA <br />$2.81 <br />$5.62 <br />Marker <br />location /identification <br />marker (EA, material <br />cost only) <br />Cut Casing At <br />Exposed casing <br />6 <br />na <br />3.00 <br />LF <br />$5.87 <br />$17.61 <br />Surface <br />removal - 4 to 10 in. <br />diameter steel pipe <br />(LF) <br />Drill Rig Time <br />ATLAS COPCO <br />na <br />na <br />8.00 <br />EA <br />$145.92 <br />$1,167.36 <br />ROC D3- 01,3.0 in. <br />Water Truck <br />Water Tanker, 5,000 <br />na <br />na <br />8.00 <br />EA <br />$67.30 <br />$538.40 <br />Time <br />Gal. <br />Water Truck <br />Water Tanker, 5,000 <br />na <br />na <br />52.00 <br />EA <br />$67.30 <br />$3,499.60 <br />Time for 5" <br />Gal. <br />Wells <br />Job Hours: 177.00 Total Cost: $63,236.53 <br />CIRCES Cost Estimating Sofiivare <br />