Laserfiche WebLink
Cost Summary Worksheet Cont'd Task # 001 Page 76 of 118 <br />Marker <br />location /identification <br />marker (EA, material <br />cost only) <br />Cut Casing at <br />Exposed casing <br />6 <br />na <br />5.00 <br />LF <br />$5.87 <br />$29.35 <br />Surface <br />removal - 4 to 10 in. <br />diameter steel pipe <br />(LF) <br />Drill Rig Time <br />ATLAS COPCO <br />na <br />na <br />12.00 <br />EA <br />$145.92 <br />$1,751.04 <br />ROC D3- 01,3.0 in. <br />Water Truck <br />Water Tanker, 5,000 <br />na <br />na <br />12.00 <br />EA <br />$67.30 <br />$807.60 <br />Time <br />Gal. <br />Bottom Plug <br />PVC plug - 6 in. <br />6 <br />na <br />1.00 <br />EA <br />$51.44 <br />$51.44 <br />for <br />diameter borehole <br />Intermediate <br />6" Well <br />Fill Holes with <br />Portland cement <br />6 <br />na <br />51.00 <br />bag <br />$11.50 <br />$586.50 <br />Concrete <br />grout ( Bag, material <br />cost only ... 94 lb. bag) <br />Borehole <br />Borehole <br />na <br />na <br />1.00 <br />EA <br />$2.81 <br />$2.81 <br />Marker <br />location /identification <br />marker (EA, material <br />cost only) <br />Cut Casing at <br />Exposed casing <br />6 <br />na <br />2.00 <br />LF <br />$5.87 <br />$11.74 <br />Surface <br />removal - 4 to 10 in. <br />diameter steel pipe <br />(LF) <br />Drill Rig Time <br />ATLAS COPCO <br />na <br />na <br />8.00 <br />EA <br />$145.92 <br />$1,167.36 <br />ROC D3- 01,3.0 in. <br />Water Truck <br />Water Tanker, 5,000 <br />na <br />na <br />8.00 <br />EA <br />$67.30 <br />$538.40 <br />Time <br />Gal. <br />Bottom Plug <br />PVC plug - 6 in. <br />6 <br />na <br />2.00 <br />EA <br />$51.44 <br />$102.88 <br />for Deep 6" <br />diameter borehole <br />Wells <br />Fill Holes with <br />Portland cement <br />6 <br />na <br />207.00 <br />bag <br />$11.50 <br />$2,380.50 <br />Concrete <br />grout ( Bag, material <br />cost only ... 94 lb. bag) <br />Borehole <br />Borehole <br />na <br />na <br />2.00 <br />EA <br />$2.81 <br />$5.62 <br />Markers <br />location /identification <br />marker (EA, material <br />cost only) <br />Cut Casing At <br />Exposed casing <br />6 <br />na <br />3.00 <br />LF <br />$5.87 <br />$17.61 <br />Surface <br />removal - 4 to 10 in. <br />diameter steel pipe <br />(LF) <br />Drill Rig Time <br />ATLAS COPCO <br />na <br />na <br />24.00 <br />EA <br />$145.92 <br />$3,502.08 <br />ROC D3- 01,3.0 in. <br />Water Truck <br />Water Tanker, 5,000 <br />na <br />na <br />24.00 <br />EA <br />$67.30 <br />$1,615.20 <br />Time <br />Gal. <br />Bottom Plug <br />PVC plug - 10 in. <br />10 <br />na <br />2.00 <br />EA <br />$96.54 <br />$193.08 <br />GVB -l0A - B <br />diameter borehole <br />Fill Holes with <br />Portland cement <br />na <br />na <br />330.00 <br />bag <br />$11.50 <br />$3,795.00 <br />Concrete <br />grout ( Bag, material <br />cost only ... 94 lb. bag) <br />Borehole <br />Borehole <br />na <br />na <br />2.00 <br />EA <br />$2.81 <br />$5.62 <br />Marker <br />location /identification <br />marker (EA, material <br />cost only) <br />Cut Casing At <br />Exposed casing <br />10 <br />na <br />5.00 <br />LF <br />$5.87 <br />$29.35 <br />CIRCES Cost Estimating Sofiivare <br />