Laserfiche WebLink
Page 2 of 2 <br />the most suitable for all areas where coal waste is stored depending on the topsoil that is <br />available in those areas. Please further revise Item 3 on page 2.04 -101 to specify that <br />coverfill materials will only be used for a topsoil supplement on Gob Piles #2 and #4 <br />where deficiencies are identified. <br />4. Please revise the third paragraph of item (5) on revised page 2.05 -50 to specifically state <br />that "coverfill material' will be used to supplement (not replace) the topsoil on Gob Piles <br />#2 and #4. <br />5. Given the deficiency in the available topsoil to be salvaged in the Gob Pile #2 expansion <br />area, the depth of coverfill and topsoil replacement will need to be revised in the <br />Reclamation section of Volume IX of the permit. Please update the topsoil replacement <br />discussion in the reclamation plan section beginning on page 14 of Volume IX. Also, <br />please update the material balance worksheet submitted in Appendix A of Volume IX. <br />6. Please update Map 32, Topsoil Distribution Plan, to include the proposed disturbance <br />area associated with the gob pile expansion. <br />If you have any questions or need additional information, please contact me. <br />Sincerely, <br />Susan L. Burgmaier <br />Environmental Protection Specialist <br />cc: Tamme Bishop, J.E. Stover & Associates <br />Jared Ebert, DRMS <br />