Laserfiche WebLink
1 ratio as required. <br />• Flood control berm along the river on the East side of the property will be allowed to <br />stay as is with the exception of removal of dead trees that are scattered around the <br />area. As allowed by the Army Corp. of Engineers.We will also clean up the profile of <br />the berm in places where equipment has moved material. <br />• As for Noxious weeds, removal of Tamarisk, Russian Olive and Russian Thistle will <br />be started as soon as possible due to the amount of material to be removed. It will <br />be piled and bumt and the areas will be sprayed to prevent future growth. <br />The total project is scheduled to be completed in 5 years, as budget and man power <br />allows, opening of the facility for public use is hopefully scheduled for the Spring of 2013. <br />Access will be for River access and fishing in the lake along with some minor picnic areas. <br />Enclosed you will find a map depicting the purposed location of roads, trails, picnic areas, <br />future play ground and parking areas. Map will also show the location of the waste piles to <br />be removed. Also included is the original reclamation plan. <br />Respectfully <br />Paul D. Suppes <br />Parks Director <br />City of Delta, Delta Co. 81416 <br />970 - 874 -7973 <br />