My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-04-15_PERMIT FILE - X201322801
DRMS
>
Day Forward
>
Permit File
>
Coal
>
X201322801
>
2013-04-15_PERMIT FILE - X201322801
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2020 5:04:58 PM
Creation date
4/15/2013 2:57:08 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
X201322801
IBM Index Class Name
Permit File
Doc Date
4/15/2013
Doc Name
Cost Estimate
From
DRMS
To
Ark Land Company
Email Name
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bulldozer Worksheet CoWd <br />Dozing method: <br />I .000 <br />Visibility: <br />1.000 <br />Job efficiency: <br />0.830 <br />Spoil pile: <br />0.800 <br />Push gradient: <br />1,000 <br />Altitude: <br />1.000 <br />Material Wei0t: <br />0.902 <br />Blade type: <br />1.000 <br />Net correction: 0.4941 <br />Adjusted unit production: 149.86 LCYe-"hr <br />Adjusted fleet production: 144.86 LCY/hr- <br />JOB TIME AND COST <br />Fleet size: I Dozer(s) <br />Unit cost: 50.840/LCY <br />Total job time: 154.17 Hours <br />Total job cost: $19,396.62 <br />Task 4 004 <br />(G EN.) <br />(AVG.) <br />(I SHIFT/DAY) <br />(SSD-AC} <br />(CAT HB) <br />(CAT HB) <br />(CAT I-IB) <br />(PAT) <br />Page 2 of 2 <br />C I R C F S Cos( F st i vria g i ng Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.