Laserfiche WebLink
Paize I of 2 <br />BULLDOZER WORK <br />Task description: _)Re <br />,pla,q_�Tosoil�onDdill Pads and Roads <br />2013-2014 Sunset Trail Permit Action: <br />Site: Exploration Drilling X201322801 Permit/Job#: X201322801 <br />PROJECT IDENTIFICATION <br />Task 4: 004 <br />Date: 4/12,12013 <br />User. 1 RR <br />State: Colorado <br />County: Gunnison <br />Agency or organization name: —D-RMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat DDT <br />Horsepower: 185 <br />Blade Type: Seri- Universal <br />Attachment: NA <br />Shift Basis: I per day <br />Data Source: kCRq) <br />Cost Breakdown: <br />Abbreviation: None <br />Filename: X229-004 <br />Total unit Cost/Hour: $125.81 <br />Total Fleet Cost/Hour: $125.81 <br />MATERIAL QUANTITIES <br />Initial Volume- 23.104 <br />Swell factor: 1.000 <br />Loose volume. 23,104 LCY <br />Source of estimated volurne: Division of Reclamation, Minim, & Safety <br />Source of estimated swell factor.- Cat Handbook ------ ------- --- <br />HOURLY PRODUCTION <br />Average push distance: 100 feet <br />Unadjusted hourly production; 303.3 LCY/hr <br />Materials consistency description: Partiv consolidated stock <br />Average push gradient <br />Average site altitude: <br />Material weight: <br />Weight description: <br />0% <br />9,800 feet <br />2,550 lbsiLCY <br />Earth - Dry packed <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />Material consistency: 1.100 (CAT HB) <br />CIRCES Cost LsffinafingSoflw'ire <br />Utilization % <br />Ownership Cost'Hour: <br />530.=13 <br />NA <br />Operating- Cost/'Hour: <br />$57.97 <br />100 <br />Ripper op. Cost/Hour: <br />X�6-0­- <br />Operator Cost/Hour- <br />$37.41 <br />NA <br />Total unit Cost/Hour: $125.81 <br />Total Fleet Cost/Hour: $125.81 <br />MATERIAL QUANTITIES <br />Initial Volume- 23.104 <br />Swell factor: 1.000 <br />Loose volume. 23,104 LCY <br />Source of estimated volurne: Division of Reclamation, Minim, & Safety <br />Source of estimated swell factor.- Cat Handbook ------ ------- --- <br />HOURLY PRODUCTION <br />Average push distance: 100 feet <br />Unadjusted hourly production; 303.3 LCY/hr <br />Materials consistency description: Partiv consolidated stock <br />Average push gradient <br />Average site altitude: <br />Material weight: <br />Weight description: <br />0% <br />9,800 feet <br />2,550 lbsiLCY <br />Earth - Dry packed <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />Material consistency: 1.100 (CAT HB) <br />CIRCES Cost LsffinafingSoflw'ire <br />