Laserfiche WebLink
Mobilization Worksheet Cont ' d Task 9 006 <br />EQUIPMENT HAUL DISTANCE and Time <br />Nearest Major City or Town within project area region: <br />Total one-way travel distance: <br />Average Travel Speed- <br />Total Non-Roadable Mob Demob Cost * <br />" * two round trips with haul rig: <br />Total Roadab le Mob/Demob Cost " * <br />" one round trip, no haul rig- <br />Transoortation Cvcle Time: <br />Haul Time (Hours): <br />Return Time (Hours): <br />Loading Time (Hours): <br />z <br />Unloadin-Time (Hours): <br />Subtotals: <br />Non-Roadable <br />Equipment <br />Roadable <br />Equipment <br />1.54 <br />1.54 <br />L54 <br />1.54 <br />0.50 <br />NA <br />OJO <br />NA <br />-- — ---------- <br />------ — ---- 1.08 — — -------------- <br />Pa�le 2 of 2 <br />GRAND JUNCTION <br />77.00 miles <br />50.00 mph <br />$2,943.00 <br />$156.31 <br />Total job time: 8.16 Hours <br />Total job cost: $3,099.31 <br />CIRCES Cost FaimadnE Soffivare <br />