My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-04-15_PERMIT FILE - X201322801
DRMS
>
Day Forward
>
Permit File
>
Coal
>
X201322801
>
2013-04-15_PERMIT FILE - X201322801
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2020 5:04:58 PM
Creation date
4/15/2013 2:57:08 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
X201322801
IBM Index Class Name
Permit File
Doc Date
4/15/2013
Doc Name
Cost Estimate
From
DRMS
To
Ark Land Company
Email Name
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page I of 2 <br />EQUIPMENT MOBILIZATION/DEMOBILIZATION <br />Task description: Mobilization anti Demobilization <br />2013-2014 Sunset Trail Permit Action: <br />Site: Exploration Drilling; X201322901 Perrnit/jobg; X201322801 <br />PROJECT IDENTIFICATION <br />Task #- 006 State., Colorado <br />Date: 4/12/2013 County: Gunnison <br />User: ERR <br />Agency or organization name: DRMS <br />EQUIPMENT TRANSPORT RIG COST <br />Abbreviation: None <br />Filename: X228 -006 <br />Shift basis: I per day <br />Cost Data Source: CRG Data <br />Truck Tractor Description: GENERIC ON-IJIGHWAY TRUCK TRACTOR, 6X4, DIESEL POWERED, <br />400 HP (2ND HALF, 2006) <br />Truck Trailer Description: GENERIC FOLDING GOOSENECK, DROP DECK EQUIPMENT TRAILER <br />(25T, 50T, AND 100T) <br />Cost Breakdown: <br />Available Rig Capacities <br />0-25 Tons <br />26-50 Tons <br />mmm 51+ Tons <br />Ow r: <br />Operating Cost/Hour: <br />$16.63 <br />w. <br />544.38 <br />$18,37 <br />$46.13 <br />$21 33 <br />30 <br />$50.07 <br />0 p flour: <br />S27.66 <br />$27.66 <br />$27.66 <br />-- — — — — — —emlatodr -Cast <br />Helper Cost/Hour: <br />Total Unit Cost/1-lou•: <br />WOO <br />x88.67 <br />$25.39 <br />$117.s5125.45 <br />$2539 <br />NON ROADA13LE EQUIPMENT: <br />Machine Weight,, Owner ship Haul Rig <br />Fleet <br />Haul Trip <br />Return Trip <br />DOT Permit <br />Description Unit Cost'l-in' unit i Cost/hr/unit <br />Size <br />Cost/hr/ <br />Cost/hr/ fleet <br />Cost/ fleet <br />(TONS) <br />fleet <br />Cat D6T r 25.01 533.12 $88.67 <br />1 <br />$121.79 <br />$88.67 <br />$250.00 <br />SCI]RAMM 1.25 $64.50 $88,07 ) <br />1 <br />$15117 <br />$88.67 <br />$250.00 <br />- — — -------- ---- — ------- <br />Subtotals: : I $274.6 $177.34 S500.00 <br />ROADABLE EQUIPMENT: <br />Return Trip <br />Retut <br />Machine Description Total Cost/hr/ unit lest �S"�ze p <br />i 1-Cosvhr/ fleet Cost/hr/ fleet <br />Water T..k,,, 2,500 6.1, 1 $50.75 1 1 $50,15 $50,75 <br />Subtotals: E'-:15554—.75 <br />CIRCT'S Cost Esfinnatinu Stl.ftware <br />
The URL can be used to link to this page
Your browser does not support the video tag.