Laserfiche WebLink
Table 2 <br />Lafarge West, Inc. <br />Gypsum Ranch Pit, Case No. 02CW211 <br />Substitute Water Supply Plan - Water Balance <br />r im Applegate <br />Group, <br />Notes <br />(1) Table 1 Column (6) <br />(2) Replacement schedule for 15 acres dry-up provided in Table 1 of Case No. 02CW211 Ruling of the Referee and Decree of the Court <br />(3) Release schedule for CRWCD Contract No. CW03001 <br />(4) Release schedule for CRWCD Contract No. CW03004 <br />(5) [Column (3) + Column (4)] * 10% <br />(6) Column (2) + Column (3) + Column (4) - Column (1) - Column (5) <br />N 09107 Lafarge W e0 Slope S W SPeDisc,phnes (TechmcalAW RPM\Water RIghls \S WSP.\Gypsum SW SP\2013 SWSP Renewa0Gypsum 2013 SW SP_V 2 xlsz <br />3/18/' -013 <br />(1) <br />(2) <br />(3) <br />(4) <br />(5) <br />(6) <br />Month <br />Total Depletions <br />During SWSP Period <br />(additional & decree CU) <br />(ac -ft) <br />Dry up Credit for 15 <br />Acres of CM Stremme & <br />Gates Ditch <br />(ac -ft) <br />CRWCD <br />Contract No. CW03001 <br />Release Schedule <br />(ac -ft) <br />CRWCD <br />Contract No. CW03004 <br />Release Schedule <br />(ac -ft) <br />Release Transit <br />Losses - 10% <br />(ac -ft) <br />Water Balance <br />_ (ac -ft) <br />Mar -13 <br />3.27 <br />0.00 <br />3.7 <br />0.18 <br />0.39 <br />0.22 <br />Apr -13 <br />6.51 <br />0.00 <br />7.5 <br />0.00 <br />0.75 <br />0.24 <br />May -13 <br />7.02 <br />6.15 <br />1.2 <br />0.00 <br />0.12 <br />0.21 <br />Jun -13 <br />7.44 <br />7.50 <br />0.1 <br />0.00 <br />. 0.01 <br />0.15 <br />Jul -13 <br />7.39 <br />6.90 <br />0.8 <br />0.00 <br />0.08 <br />0.23 <br />Aug -13 <br />7.23 <br />4.95 <br />2.8 <br />0.00 <br />0.28 <br />0.24 <br />Sep -13 <br />6.55 <br />4.05 <br />3.0 <br />0.00 <br />0.30 <br />0.20 <br />Oct -13 <br />6.07 <br />1.05 <br />5.8 <br />0.00 <br />0.58 <br />0.20 <br />Nov -13 <br />4.37 <br />0.00 <br />5.1 <br />0.00 <br />0.51 <br />0.22 <br />Dec -13 <br />0.85 <br />0.00 <br />0.2 <br />0.94 <br />0.11 <br />0.18 <br />Jan -14 <br />0.85 <br />0.00 <br />0.2 <br />0.94 <br />0.11 <br />0.18 <br />Feb -14 <br />0.85 <br />0.00 <br />0.2 <br />0.94 <br />0.11 <br />0.18 <br />Total <br />58.40 <br />30.60 <br />30.6 <br />3.00 <br />3.36 <br />2.44 <br />Table 2 <br />Lafarge West, Inc. <br />Gypsum Ranch Pit, Case No. 02CW211 <br />Substitute Water Supply Plan - Water Balance <br />r im Applegate <br />Group, <br />Notes <br />(1) Table 1 Column (6) <br />(2) Replacement schedule for 15 acres dry-up provided in Table 1 of Case No. 02CW211 Ruling of the Referee and Decree of the Court <br />(3) Release schedule for CRWCD Contract No. CW03001 <br />(4) Release schedule for CRWCD Contract No. CW03004 <br />(5) [Column (3) + Column (4)] * 10% <br />(6) Column (2) + Column (3) + Column (4) - Column (1) - Column (5) <br />N 09107 Lafarge W e0 Slope S W SPeDisc,phnes (TechmcalAW RPM\Water RIghls \S WSP.\Gypsum SW SP\2013 SWSP Renewa0Gypsum 2013 SW SP_V 2 xlsz <br />3/18/' -013 <br />